Air Compressor Integrated High Efficiency Chestnut Sorting Machine with 2 Ton Capacity
Product Introduction
Elevate Efficiency with Air Compressor Integration
Efficiency reaches new heights as our Chestnut Sorting Machine seamlessly collaborates with air compressors. Dive into the symbiotic relationship between the machine and compressors, optimizing the overall sorting process. Explore how compressed air is harnessed to propel chestnuts through the sorting lanes, ensuring a controlled and efficient workflow. Uncover the nuances of this integration, from adjustable air pressure settings to the impact on energy consumption, highlighting the holistic approach our machine takes toward enhancing overall processing efficiency.
Material Sorting Effects
Product Specification
No. | Lanes | Output (t/h) | Voltage (V/Hz) | Power (kW) | Air Pressure (MPa) | Air Consumption (m3/min) | Dimension (LxWxH mm ) | Weight (kg) |
LJG04-1208B | 12 | 2 | 380/50 | 6 | >0.6 | 5 | 9276*3662*2004mm | 4250 |
Remarks: The output and air consumption change according to state of raw materials, finished materials and channels division. Above data for reference only.
Product Features
Certificates
Quality Management System Certificate, CE Certificate
Packaging & Shipment
Due to chestnut sorting machine is very large, usually it will be module packed with large durable pallet and covered stretch film to ensure good condition during long-term ocean shipment. For other small parts, they're packed into multi-layer corrugated boxes.
All packages is aimed to protect the machine from any damaged during the complicated shipment.
Warranty
We provide 1-year warranty for our pistachio sorting equipment. In addition, spare and wear parts are available to sent along with the shipment so it's easier to get the equipment at the best working status time and time.
Business Procedures
After Sale Services
FAQ
Q: How can I know your equipment suitable for our chestnut or not? Can you send a process video?
A: We accept chestnut samples and take videos during real processing, so you will have an obvious look at the effect to our dates sorting equipment. In addition, your visit to our manufacturing base is greatly recommended.
Q: What about the lead time?
A: Refer to our business procedures, it will take 15-30 days after contract signed and deposit received, namely after our proposal is agreed to cater your actual demands.