AI Deep Learning Pistachio Sorting Machine with 20 Channels and 8 Discharge Ports
Product Introduction
Beyond Grading: The Intelligence of the 20-Channel Pistachio Sorting Machine Unveiled
Embark on a journey into the heart of pistachio grading intelligence with the JGY Pistachio Sorting Machine. Boasting 20 feed channels and 8 discharge ports, this machine goes beyond traditional sorting. Industrial-grade cameras meticulously inspect each pistachio, allowing the AI deep learning model to differentiate between colors and conditions. From yellow to black, stained to husked, every nut finds its rightful place in the sorting process. With a capacity of 600-700 nuts per minute, this machine isn't just a sorter; it's a technological marvel redefining the landscape of pistachio processing.
Material Sorting Effects
Product Specification
Model | LKXG042008B |
---|---|
Lane number | 20 |
Output (kg/h) | 800-1100 |
Voltage (V/Hz) | 380/50 |
Power (kW) | 7.93 |
Air Pressure (MPa) | >0.6 |
Air Consumption (m3/mim) | 5 |
Dimension of Main Sorting(mm) | 8722*2975*2004 |
Weight (kg) | 5980 |
Remarks: data takes American pistachios as an example. The output and air consumption change according to state of raw materials, finished materials and channels division. Above data for reference only.
Product Features
Certificates
Quality Management System Certificate, CE Certificate
Packaging & Shipment
Warranty
We provide 12 months warranty for our pistachio sorting equipment. In addition, spare and wear parts are available to sent along with the shipment so it's easier to get the equipment at the best working status time and time.
Business Procedures
After Sale Services
FAQ
Q: How can I know your equipment suitable for our nuts or not? Can you send a process video?
A: We accept nut samples and manage videos conference during testing, so you will have an obvious look at the effect to our dates sorting equipment. In addition, your visit to our manufacturing base is greatly recommended.
Q: What about the lead time?
A: Refer to our business procedures, it will take 15-30 days after contract signed and deposit received, namely after our proposal is agreed to cater your actual demands.