Leading 360° Visual Inspection 380V 1T Output Pistachio Sorting Machine for Mass Processing
Product Introduction
In the competitive landscape of pistachio processing, our company stands out with its groundbreaking sorting technology. The heart of our equipment lies in its ability to scrutinize each pistachio from every angle, thanks to the 360° rotation mechanism. This, coupled with the high-speed image capture, enables the system to create a detailed fingerprint of each pistachio.
The comparison process, facilitated by an extensive pistachio model database, ensures that every pistachio finds its rightful place in one of the eight output categories. Whether it's the pristine openness or the nuanced shell features, our equipment elevates pistachio quality, meeting the demands of discerning markets worldwide.
Material Sorting Effects
Product Specification
Model | LKXG042008B |
---|---|
Lane number | 20 |
Output (t/h) | 0.8-1.1 |
Voltage (V/Hz) | 380/50 |
Power (kW) | 7.93 |
Air Pressure (MPa) | >0.6 |
Air Consumption (m3/mim) | 5 |
Dimension of Main Sorting(mm) | 8722*2975*2004 |
Weight (kg) | 5980 |
Remarks: data takes American pistachios as an example. The output and air consumption change according to state of raw materials, finished materials and channels division. Above data for reference only.
Product Features
Certificates
Quality Management System Certificate, CE Certificate
Packaging & Shipment
Warranty
We provide 12 months warranty for our pistachio sorting equipment. In addition, spare and wear parts are available to sent along with the shipment so it's easier to get the equipment at the best working status time and time.
Business Procedures
After Sale Services
FAQ
Q: How can I know your equipment suitable for our dates or not? Can you send a process video?
A: We accept dates samples and take videos during real processing, so you will have an obvious look at the effect to our dates sorting equipment. In addition, your visit to our manufacturing base is greatly recommended.
Q: What about the lead time?
A: Refer to our business procedures, it will take 15-30 days after contract signed and deposit received, namely after our proposal is agreed to cater your actual demands.