360° Non-blind Area Inspection Pistachio Sorting Machine 1000kg Capacity with CE Certified
Product Introduction
Delving into the intricacies of our pistachio sorting equipment, precision is the key. As each pistachio embarks on a 360° journey along the conveyor, the camera diligently captures multiple images, creating a comprehensive visual profile. These images are then cross-referenced with an extensive database of pistachio models, allowing the equipment to make real-time decisions regarding the pistachio's grade.
The eight output ports serve as the gateways to perfection, ensuring that pistachios are sorted with unmatched accuracy. From flawlessly opened pistachios to those with distinctive shell characteristics, our equipment guarantees a seamless sorting process, meeting the diverse needs of the pistachio industry. Embrace precision with our cutting-edge pistachio sorting solution.
Material Sorting Effects
Product Specification
Model | LKXG042008B |
---|---|
Lane number | 20 |
Output (t/h) | 0.8-1.1 |
Voltage (V/Hz) | 380/50 |
Power (kW) | 7.93 |
Air Pressure (MPa) | >0.6 |
Air Consumption (m3/mim) | 5 |
Dimension of Main Sorting(mm) | 8722*2975*2004 |
Weight (kg) | 5980 |
Remarks: data takes American pistachios as an example. The output and air consumption change according to state of raw materials, finished materials and channels division. Above data for reference only.
Product Features
Certificates
Quality Management System Certificate, CE Certificate
Packaging & Shipment
Warranty
We provide 12 months warranty for our pistachio sorting equipment. In addition, spare and wear parts are available to sent along with the shipment so it's easier to get the equipment at the best working status time and time.
Business Procedures
After Sale Services
FAQ
Q: How can I know your equipment suitable for our dates or not? Can you send a process video?
A: We accept dates samples and take videos during real processing, so you will have an obvious look at the effect to our dates sorting equipment. In addition, your visit to our manufacturing base is greatly recommended.
Q: What about the lead time?
A: Refer to our business procedures, it will take 15-30 days after contract signed and deposit received, namely after our proposal is agreed to cater your actual demands.