98% Accuracy 1100kg Output High Efficient CE Certified Pistachio Sorting Machine
Product Introduction
Step into a world of unmatched capabilities with our revolutionary pistachio sorting system. At the core of its prowess is the ability to capture the essence of each pistachio through a dynamic 360° rotation. The accompanying camera, working in harmony with sophisticated algorithms, analyzes the pistachio's features in real-time.
With a comprehensive database of pistachio models, the system precisely categorizes each pistachio into one of the eight grades, ensuring a seamless sorting process. This level of precision not only meets but exceeds industry standards, making our pistachio sorting system the epitome of efficiency and reliability.
Material Sorting Effects
Product Specification
Model | LKXG042008B |
---|---|
Lane number | 20 |
Output (t/h) | 0.8-1.1 |
Voltage (V/Hz) | 380/50 |
Power (kW) | 7.93 |
Air Pressure (MPa) | >0.6 |
Air Consumption (m3/mim) | 5 |
Dimension of Main Sorting(mm) | 8722*2975*2004 |
Weight (kg) | 5980 |
Remarks: data takes American pistachios as an example. The output and air consumption change according to state of raw materials, finished materials and channels division. Above data for reference only.
Product Features
Certificates
Quality Management System Certificate, CE Certificate
Packaging & Shipment
Warranty
We provide 12 months warranty for our pistachio sorting equipment. In addition, spare and wear parts are available to sent along with the shipment so it's easier to get the equipment at the best working status time and time.
Business Procedures
After Sale Services
FAQ
Q: How can I know your equipment suitable for our dates or not? Can you send a process video?
A: We accept dates samples and take videos during real processing, so you will have an obvious look at the effect to our dates sorting equipment. In addition, your visit to our manufacturing base is greatly recommended.
Q: What about the lead time?
A: Refer to our business procedures, it will take 15-30 days after contract signed and deposit received, namely after our proposal is agreed to cater your actual demands.