98% Accuracy 1100kg per Hour Efficient Pistachio Sorting Machine with 8 Discharge Ports
Product Introduction
In the realm of pistachio sorting, efficiency is paramount, and our cutting-edge technology delivers just that. The marriage of 360° rotation and high-resolution imaging empowers our equipment to meticulously analyze each pistachio, leaving no detail unnoticed. This technology, driven by advanced algorithms and a robust pistachio model library, guarantees swift and accurate sorting.
The eight output ports serve as the final destinations for the pistachios, each port corresponding to a specific grade. From the smooth texture of well-opened pistachios to the unique characteristics of various shell types, our sorting equipment ensures that pistachios are efficiently classified, meeting the demands of modern pistachio processing.
Material Sorting Effects
Product Specification
Model | LKXG042008B |
---|---|
Lane number | 20 |
Output (t/h) | 0.8-1.1 |
Voltage (V/Hz) | 380/50 |
Power (kW) | 7.93 |
Air Pressure (MPa) | >0.6 |
Air Consumption (m3/mim) | 5 |
Dimension of Main Sorting(mm) | 8722*2975*2004 |
Weight (kg) | 5980 |
Remarks: data takes American pistachios as an example. The output and air consumption change according to state of raw materials, finished materials and channels division. Above data for reference only.
Product Features
Certificates
Quality Management System Certificate, CE Certificate
Packaging & Shipment
Warranty
We provide 12 months warranty for our pistachio sorting equipment. In addition, spare and wear parts are available to sent along with the shipment so it's easier to get the equipment at the best working status time and time.
Business Procedures
After Sale Services
FAQ
Q: How can I know your equipment suitable for our dates or not? Can you send a process video?
A: We accept dates samples and take videos during real processing, so you will have an obvious look at the effect to our dates sorting equipment. In addition, your visit to our manufacturing base is greatly recommended.
Q: What about the lead time?
A: Refer to our business procedures, it will take 15-30 days after contract signed and deposit received, namely after our proposal is agreed to cater your actual demands.