Multiple Lane Number Options Chestnut Sorting Machine with CE Certificate
Product Introduction
Standard Sorting Lanes of 6, 8, or 12
Tailor your chestnut sorting experience to perfection by selecting from our standard sorting lane options of 6, 8, or 12. Take a deep dive into the versatility embedded in our machine's design, understanding the intricacies of each configuration. Explore how these options cater to businesses with varying production capacities, ensuring a customized solution for every processing need. From the layout of the sorting lanes to the automated adjustments based on chosen configurations, our machine offers a level of adaptability that sets it apart in the chestnut processing landscape.
Material Sorting Effects
Product Specification
No. | Lanes | Output (t/h) | Voltage (V/Hz) | Power (kW) | Air Pressure (MPa) | Air Consumption (m3/min) | Dimension (LxWxH mm ) | Weight (kg) |
LJG04-1208B | 12 | 2 | 380/50 | 6 | >0.6 | 5 | 9276*3662*2004mm | 4250 |
Remarks: The output and air consumption change according to state of raw materials, finished materials and channels division. Above data for reference only.
Product Features
Certificates
Quality Management System Certificate, CE Certificate
Packaging & Shipment
Due to chestnut sorting machine is very large, usually it will be module packed with large durable pallet and covered stretch film to ensure good condition during long-term ocean shipment. For other small parts, they're packed into multi-layer corrugated boxes.
All packages is aimed to protect the machine from any damaged during the complicated shipment.
Warranty
We provide 1-year warranty for our pistachio sorting equipment. In addition, spare and wear parts are available to sent along with the shipment so it's easier to get the equipment at the best working status time and time.
Business Procedures
After Sale Services
FAQ
Q: How can I know your equipment suitable for our chestnut or not? Can you send a process video?
A: We accept chestnut samples and take videos during real processing, so you will have an obvious look at the effect to our dates sorting equipment. In addition, your visit to our manufacturing base is greatly recommended.
Q: What about the lead time?
A: Refer to our business procedures, it will take 15-30 days after contract signed and deposit received, namely after our proposal is agreed to cater your actual demands.