1 Tons 12000 BTU Split Air Conditioner Wall Mouted Cooling / Heating
Indoor
Outdoor
Specification
Model |
Automatic 12000 BTU Split Air Conditioner With LED Motion Display Easy To Check |
Color |
White |
Cooling Capacity |
12000 Btu/h = 3500 W |
Heating Capacity |
12000 Btu/h = 3500 W |
Voltage |
220~240 / 50Hz |
EER |
2.9 |
COP |
3.0 |
Air Flow Volume |
600 m³/h |
Noise Level (indoor/outdoor) |
42/50 dB |
Net Dimension (indoor) |
784*311*262mm |
Net Dimension (outdoor) |
700*551*256mm |
Packing Dimension (indoor) |
860*322*267mm |
Packing Dimension (outdoor) |
811*361*600mm |
Weight (indoor) |
9/11 |
Weight (outdoor) |
29/33 |
Piping Size |
6.00mm (liquid) /12mm (gas) |
MOQ |
1*40HQ (246pcs) |
Principle :
1. How does the solar air conditioner work?
PV Solar panels produce electricity. Electricity is saved in the batteries as an energy bank. Batteries drive the air conditioner to run both cooling and heating. The Solar Controller protects the whole system and provides stable power supply.
Packaging & Shipping
Shipping
1. FedEx/DHL/UPS/TNT for samples, Door-to-Door;
2. By Air or by Sea for batch goods, for FCL; Airport/ Port receiving;
3. Customers specifying freight forwarders or negotiable shipping methods!
4. Delivery Time: 7workdays for samples; 15 workdays for batch goods.
Package specification:
Liquid Quantity(R410A) (Kg) |
0.95 |
1.05 |
1.55 |
2.3 |
||
Indoor unit |
Noise dB(A) |
41 |
43 |
45 |
48 |
|
Net Weight/Gross Weight(kg) |
11.2/14.8 |
11.2/14.8 |
16.5/19 |
16.5/19 |
||
Outdoor unit |
Noise dB(A) |
52 |
54 |
56 |
60 |
|
Net Weight/Gross Weight(kg) |
35/40 |
35/40 |
61/66 |
65/70 |
||
Indoor unit |
Net Dimension(mm) |
795*285*215 |
795*285*215 |
1090*330*255 |
1090*330*255 |
|
Shipping Dimension (mm) |
905*370*283 |
905*370*283 |
1145*375*315 |
1145*375*315 |
||
Outdoor unit |
Net Dimension (mm) |
760*255*525 |
760*255*525 |
865*310*710 |
865*310*710 |
|
Shipping Dimension (mm) |
890*360*590 |
890*360*590 |
1025*395*790 |
1025*395*790 |
maintenance
1,Damages caused during the transportation,load,installation which made by upload, transportation ,installation principal.
2,During the debug,damages caused by inappropriate test behaviors should be on charge by the debug team.
3,After debugging is completed and the equipments can be work normally,any mistaken manual operations made by the users should be on charge for the damage.
4,Any movements,dissemble and repair /maintenance operated by other company or person which leads to damage should be on response.
5,Natural disasters result from force manure