NM Fire 2000 GPM Fire Pump Assembly NFPA 20 Skid Mounted Fire Pump
Main Configurations:
Name | Model |
OS&Y Gate Valve (Suction Control Valve) | 10" |
Relief Cone | 8”-6” |
Relief Valve | 2050B-4KG1 Angle 6” ANSI B16.5 100-300psi |
Check Valve (Pump Discharge) | 10" |
OS&Y Gate Valve (Discharge Control Valve) | 10" |
Automatic Air Release | 3410AR-116 1/2" |
Butterfly Valve (Test the pipe) | 8" |
Butterfly Valve (Test Header) | 8" |
Flow Meter | 8"-2000-G |
Test Header | DN65 |
Vacuum Manometer | Φ100 -0.1~1.5bar |
Pressure Gauge | Φ100 0~16bar |
Automatic Air Release | 3410AR-116 1/2" |
Pump assembly | SCF200-150-330 2000usgpm/150psi |
Diesel engine assembly | NM6-110D 2900rpm/200kw |
Fuel Tank | 1200L D.W |
jockey Pump | CDL4-10 20usgpm@160psi 2pole/4kw 220V |
Circulation safety valve | Cla-Val 55L-60 100-300PSI 3/4" |
Vacuum Manometer | Φ100 -0.1~1.5bar |
Pressure Gauge | Φ100 0~16bar |
Check Valve (Jockey Pump Discharge) | H41H DN32 |
Isolation Valve (JockeyPump Discharge&Suction) | Z41H DN32 |
Check Valve (Pressure Sensing Line ) | H12 1/2” PN16 |
Ball valve ( Pressure Sensing Line ) | 1/2” PN16 |
Pressure Gauge ( Pressure Sensing Line ) | Φ100 0~16bar |
Pressure Maintenance Pump Controller (Jockey Pump) | JP3-220V-5.5HP-3PH-60HZ |
Fire Pump Controller | GPD24-220 |
Performance Ranges:
| Q: 100-750GPM | H:100-145PSI |
| Q: 100-750GPM | H:100-145PSI |
| Q:5-150L/S | H:0.40-1.6Mpa |
| Q: 100-2250GPM | H:60-230PSI |
Advantage:
First-Class testing and inspection equipment.
UL certification represents the world's highest technical standards of fire certification,but also means that certified fire products must withstand the most extreme,harsh test process,the purpose of certification designed to verify whether the product meets the performance,safety and quality requirements,so as to achieve the purpose of property protection.
NM fire obtained fire diesel engine UL1247 and fire pump UL448 witnessed laboratory accreditation,fully proved that the company in terms of hardware and software strength,are to meet the strict requirements of UL certification.
Service:
1. Reply within 24 hours. |
2. High-quality products and the most reasonable price |
3. Data and chemical technology support. |
4. Professional team service |
5. Customiszed production for different package |
6. No delay on shipment |