Specification
Make process | Cut the raw material pipe→ Ash loading process→ Suppress →Annealing treatment →Pickling →Polishing→ Rolling sand processing →Do one more pickling→ Bevel end machining |
Delivery time | within 45 -60 days. |
Payment Terms | 40% prepayment Balance before lodaing. |
Shipping Terms | FOB NINGBO, after the inspection of goods at supplier's warehouse |
End | Plain end |
Grade | C ≤ | Si ≤ | Mn ≤ | P ≤ | S ≤ | Ni ≤ | Cr ≤ |
TP321 | 0.04-0.10 | 0.75 | 2 | 0.045 | 0.03 | 9.00-13.00 | 17.00-20.00 |
Mechanical Composition
Grade | Tensile | Yield | %Age | Hardness (Max) | |
Strength Mpa, (Min) | Strength | Elongation | |||
Mpa, (Min) | in 50mm | ||||
gauge length min | BHN | Rb | |||
TP321 | 515 | 205 | 40 | 217 | 95 |
Product Testing
Component analysis
penetrating test
impact test
Package Process
Inside:Plastic film packaging.
Image