Solar Energy Cold Rolled Grade 301 Stainless Steel Pipe BA Surface 0.5mm
1. 301 stainless steel pipe product details
Name | Stainless steel pipe |
Grade | 301 |
Surface | BA surface |
Technique | cold rolled |
Standard | AISI,ASTM,DIN,JIS,GB,JIS,SUS,EN,etc |
Capacity | 3,000 tons/year |
Payment terms | T/T,West Union |
All standard products are supplied without inter paper & PVC film. If needed, please inform.
2. Stainless steel composition
Grade | C | SI | Mn | P | S | Cr | Ni | Others |
301 | ≤0.15 | ≤1.00 | ≤2.00 | ≤0.045 | ≤0.030 | 16.00-18.00 | 6.0-8.0 | |
301l | ≤0.03 | ≤1.00 | ≤2.00 | ≤0.045 | ≤0.030 | 18.00-20.00 | 8.0-10.5 | N≤0.02 |
302 | ≤0.15 | ≤1.00 | ≤2.00 | ≤0.035 | ≤0.030 | 17.00-19.00 | 8.0-10.00 | |
303 | ≤0.15 | ≤1.00 | ≤2.00 | ≤0.02 | ≤0.15 | 17.00-19.00 | 8.0-10.00 | Mo≤0.6 |
304 | ≤0.08 | ≤1.00 | ≤2.00 | ≤0.045 | ≤0.030 | 18.00-20.00 | 8.0-10.5 |
3. Stainless Steel Surface
Surface finish | Characteristics and application |
BA | Cold rolled, bright annealed and skin-passed, the product have excellent brightness and good reflexivity like mirror, kitchen apparatus, ornament etc. |
8K | The product have excellent brightness and prefer reflexivity can to be the mirror. |
HL | Polished with abrasive belt of grit #150-#320 on the NO.4 finish and has continuous streaks, mainly used as buildings ornaments elevators, door of building, frontal plate etc. |
2B | The surface brightness and flatness of no2B is better than no2D. then through a special surface treatment to improve its mechanical properties,No2B could nearly satisfy comprehensive uses. |
4. Product pictures
5.Stainless steel sheet different surface
6: Packing
7. FAQ
Q1: Are you trading company or manufacturer ?
A: We are factory for processing service and have own houseware.
Q2: How long is your delivery time?
A: Generally it is 3-7 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is
according to quantity.
Q3: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q4: What are your payment terms?
A: Our payment method is 30% byT/T and 70% payment before delivery.