Specifications
Brand Name :
FAMOUS
Model Number :
CB100(321-Type)&HD200
Certification :
ISO9001
Place of Origin :
China
MOQ :
1
Price :
USD1000~USD1200 per ton
Payment Terms :
L/C, T/T, D/A, D/P, Western Union
Supply Ability :
600,000 tons per Year
Delivery Time :
30 days
Packaging Details :
seaworthy packings for container shipping
Material :
Q345B steel
Standard :
AISI, ASTM, BS, DIN, GB, JIS
Dimensions :
Standard
Place of origin :
Hangzhou, China
Type :
Modular Deck -type Assembly Steel Bridges
Applicationa :
Temporary or Permanent Steel Structure Bridge
Color :
light gray, hot galvanized
Description

Prefab Delta Covered Bridge Temporary Bailey Bridge Light Steel Structure Truss Bridge Project


The Delta Covered Bridge was constructed in 1867 at a cost of $1,620 and was the only arch-style covered bridge west of the Mississippi River. The bridge hovered over the North Skunk River south of Delta. The bridge was completed in 1869 with an architectural design by Jerry Merrifield and carried traffic such as steam engines for threshing machines. The roof was covered by hand-hewned shakes and was replaced with cedar shingles. The bridge spanned 12 feet wide and 80 feet long and built of native timbers, oak and red elm, with pine framework.

No.ItemDetails of steel structure bridge or steel frame
1MaterialMaterialQ235, Q345B,etc. carbon structural steel
2ProduceLead timeNormal 45-60days after contract according to quantity.
3QualityCertificationQuality certificate from factory, the third party by client request.
4DimensionsLengthH beam: 4000-15000mm
5Thickness:web plate: 6-32mm
6wing plate: 6-40mm
7Height200-1200mm
8ColorAccording to customers



Characteristics

  1. Higher reliability of steel work. Long using time up to 50 years;
  2. Steel structure is impact, stable and good anti-seismic of the weight is light.
  3. Steel structure used for a higher degree of industrialization.
  4. Steel structures can be assembled quickly and accurately, time saving and labor saving
  5. Large interior space of steel structure or steel frame, the max span of prefab steel structure can reach 100meters
  6. Likely to cause sealing structure.
  7. Beautiful appearance: can use different colors and structure.
  8. Environment friendly: Most of the excess material can be 100% recycled;
  9. Lower cost and easy maintenance.
  10. Flexible: can be dismantled and enlarged
  11. Manufacture under complete quality control system---ISO9001/ISO14000.

Prefab Project Delta Bridge Truss Temporary Bailey Light Q345B Steel Structure

Modular lengthCarriageway widthsNumber of spansInternal pedestrian walkwaysCantilever pedestrian walkwaysCoating treatment
4.5-7.3m4.2m to 10m1, 2 etc..According to customer's demandUp to 1.5mNormal Anti-rust painting,
Hot-dip Galvanised:
BS EN ISO 14713 & 1461
ASTM A123




Advantages:

  • Modular
  • Rapid-build
  • Robust
  • Can be assembled using light plant
  • Can be crane built or cantilever launched
  • Relocatable
  • Transported in standard containers
  • Designed for high fatigue, permanent applications
  • Long life with minimal maintenance
  • Preloaded bolted connections
  • Parapets as standard
  • Factory applied anti-skid deck surfacing as standard
  • Optional footwalks


Finally we would like to emphasize that not like other companies, nearly all machining parts and mechanical accessories are manufactured in our own shop as we have so many wonderful machines and workers inside. In this way, the quality, cost and delivery time can be ensured which eliminates other exterior factors’ influence.
Warmly welcome all friends and clients from International market to visit us!
Prefab Project Delta Bridge Truss Temporary Bailey Light Q345B Steel Structure
















Send your message to this supplier
Send Now

Prefab Project Delta Bridge Truss Temporary Bailey Light Q345B Steel Structure

Ask Latest Price
Brand Name :
FAMOUS
Model Number :
CB100(321-Type)&HD200
Certification :
ISO9001
Place of Origin :
China
MOQ :
1
Price :
USD1000~USD1200 per ton
Contact Supplier
Prefab Project Delta Bridge Truss Temporary Bailey Light Q345B Steel Structure
Prefab Project Delta Bridge Truss Temporary Bailey Light Q345B Steel Structure
Prefab Project Delta Bridge Truss Temporary Bailey Light Q345B Steel Structure

Hangzhou USEU Metal Manufacturing Company

Verified Supplier
7 Years
zhejiang, hangzhou
Since 2004
Business Type :
Manufacturer
Total Annual :
1000000-10000000
Employee Number :
200~300
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement