ME type electric double girder gantry crane with two trolleys for shipyard
ME type electric double girder gantry crane with two trolleys for shipyard is a large tonnage A-type double-girder hook gantry crane. Due to the heavy lifting,it is often equipped with double lifting trolleys, and in order to make this kind of large-tonnage crane more widely used, in addition to two lifting trolleys, an electric hoist can also be installed on the lower edge of the main beam to lift small cargos in the workplace.Hanging beams can be installed under the main hooks of the two trolleys as required.This kind of tonnage crane has four sets of wheels, each set of wheels will be equipped with multiple wheels to support the crane.(Optional configurations)
The box-shaped double girder welded structure can increase the working space and facilitate transportation and installation and repair cranes.
The trolley adopts flexible cable to conduct electricity, the crane adopts sliding contact wire type, and there are many kinds of cable reels to choose from. The double-girder gantry crane adopts a closed air-conditioned control room with a linkage control table, which has the advantages of flexible operation, high work efficiency, comfortable work and wide vision.
Features:
Application | This product is widely used in large construction sites such as shipyards, highways, railway buildings,subway construction,etc. It is prohibited to use the equipment in the combustible, explosive or corrosive environment,like this special environment requires special cranes, such as explosion-proof cranes. | |||||
Control methods | >>Pendent line with press button >>Cabin control >>Wireless Remote control | |||||
Painting | >>primer and finishing paint;Anti-corrosion coating >>Color: yellow, red, blue according to your demand. >>Average thickness: about 100 microns | |||||
Service | We could provide turn-key project as your demand include design, manufacture,quality assurance, assembling, testing, commissioning, training and after service. | |||||
Design and Construction Rules | All the standards required the crane is according to china standards | |||||
Safety Guarantee | Weight overload protection device, Top quality long time bearing polyurethane materials buffer, Crane traveling limit switch, Voltage lower protection function, Emergency stop system, Current overload protection system and so on! |
Item | hoisting mechanism | Item | running institutions | |||||||
main lifting | electric hoist | 80t trolley | 80t trolley | crane | ||||||
lifting weight/t | 80 | 80 | 10 | gauge/mm | 5500 | 5500 | 36000 | |||
lifting speed(m/min) | 1~10 | 1~10 | 7 | running speed(m/min) | 1.5~15 | 1.5~15 | 2~20 | |||
lifting height/m | 15+24 | 15+24 | 13.65+24 | based distance/mm | 3400 | 3400 | 10800 | |||
working level | M6 | M6 | M3 | working level | M6 | M6 | M6 | |||
power supply | Three-phase AC 50Hz 380V | |||||||||
electric motor | model | YZP400L1-10 | YZP400L1-10 | lifting motor | ZD41-4 | buffer stroke/mm | 100 | 100 | 125 | |
power/kw | 160 | 160 | 13 | rail model | P43 | P43 | QU70 | |||
speed (r/min) | 600 | 600 | 1400 | wheel diameter/mm | Ø600 | Ø600 | Ø700X16 | |||
reducer | model | ZQA1000-i-3CA | ZQA1000-i-3CA | running motor | ZDY121-4 | max.wheel pressure/KN | 251 | 251 | 376 | |
speed ratio | 23.34 | 23.34 | 0.8X2 | electric motor | model | YZP160M2-6 | YZP160M2-6 | YZP180L-8 | ||
braker | model | YWZ4-500/E201 | YWZ4-500/E201 | 1380 | power/kw | 8.5 | 8.5 | 13X4 | ||
braking torque(N.m) | 3600 x 2 | 3600 x 2 | speed (r/min) | 1000 | 1000 | 750 | ||||
pusher model | ED201/6 | ED201/6 | reducer | model | ZSCA750 | ZSCA750 | ZSC(A)-650-1/2 | |||
wire rope | model | 28NAT6W(19)-FC-1770 | 28NAT6W(19)-FC-1770 | speed ratio | 133.91 | 133.91 | 82 | |||
count | 12 | 12 | braker | model | YWZB-200/25 | YWZB-200/25 | YWZB-300/25 | |||
working rally(KN) | 75 | 75 | braking torque(N.m) | 200 | 200 | 320X4 | ||||
reel | Ø1000 | Ø1000 | pusher model | YT1-25ZB/4 | YT1-25ZB/4 | YT1-25ZC/4 |
Latest case :Zoomlion with Henan Mine Crane.