Pre Built Steel Buildings Portal Frame Structure Factory Buildings Construction
Pre Built Steel Buildings Portal Frame Structure Factory Buildings Construction. This Pre Built Steel Buildings Portal Frame Structure Factory Buildings is a new-built modern tyre production factory. Our service scope for this project include steel structure design, fabrication and construction.
In the construction industry, with the increasing popularity of prefabricated steel structure factory buildings, the fabrication, transportation and installation technology of prefabricated steel structure factory has received more and more attention, and it has also been rapidly developed and continuously improved.
Name | Pre Built Steel Buildings Portal Frame Structure Factory Buildings Construction |
Structure Type | Portal frame, single ridge, two slopes, multi spans |
Length | 240 m |
Width | 160m |
Eave Height | 12m |
Roof Slope | 10% |
Gable Wall Column Spacing | 7.5m |
Roof | steel cladding sheet, sandwich panel |
Wall | steel cladding sheet, sandwich panel |
Door | Sliding door |
Window | Ribbon Skylight |
Height difference between indoor and outdoor | 300mm |
No. | Item | Details of steel structure building or steel frame | |
1 | Material | Material | carbon structural steel |
2 | Produce | Lead time | Normallly 45days after down payment, also according to quantity. |
3 | Quality | Certification | Quality certificate from factory, the third party by client request. |
4 | Dimensions | Length | H beam: 4000-15000mm |
5 | Thickness: | web plate: 6-32mm | |
6 | wing plate: 6-40mm | ||
7 | Height | 200-1200mm | |
8 | Color | According to customers | |
9 | Size | MOQ is 1000 m2, width * length * eave height, | |
10 | Main components | Base | Cement and steel foundation bolts |
11 | Main frame | H Steel beam, Q235 Q345 steel H beam and columns, painted or galvanized, box steel, galvanized C section or steel pipe | |
12 | Secondary frame : | galvanized C or Z purlin , steel bracing , tie bar , knee brace ,flashing etc. | |
13 | Material | Q235B, Q345B or others as buyers' requests, like: ASTM, BSEN, DIN, IPE,AISI,JIS, | |
14 | Purlin | C or Z purlin: Size from C120~C320, Z100~Z20 | |
15 | Column | X-type, tree type ,lattice, Cross, Box etc. | |
16 | Bolt | Plain bolt and High-strength bolt | |
17 | Roof & wall | PU sandwich panel, Rockwool sandwich panel or Corrugated steel sheet | |
18 | Canopy | steel sheet, PU sandwich panel, Rockwool sandwich panel | |
19 | Door | Sliding or rolling door | |
20 | Window | Aluminium alloy window | |
21 | Surface | Two lays of rust-proof painting or Hot Dip Galvanized | |
22 | Sheet | 0.5mm or 0.6mm galvanized sheet | |
23 | Accessories | Semi-transparent skylight belts, Ventilators,down pipe, Galvanized gutter, Trim, flashing, etc | |
24 | Finishing options | Vast array of colors and textures available, Alkyd painting, two primary painting, two finish painting (gray paint, red paint, white paint, epoxy zinc etc.). Or Galvanized. | |
25 | Usages | 1. Steel workshop, steel warehouse, steel structure plant | |
26 | 2. Steel web frame structure | ||
27 | 3. Steel H-column and steel H-beam | ||
28 | 4. Portal frame products | ||
29 | 5. High rise building project | ||
30 | 6. Others steel structure buildings | ||
31 | Drawing | According to drawings or steel structure design, according to customer's requirement. |
The floor space of our steel structre fabrication factory is 35,000㎡, and the workshop area is 20000㎡. We own three light/heavy H steel production lines, BOX production lines, C/Z purlin production lines and various types of profiling steel sheet machines with advanced equipment such as plasma cutting machine.
Before the installation of the steel structure factory building, it is necessary to do a good job in all the preliminary work. For example, before lifting, the installer should re-test the components, and the lifting can only be carried out under the premise that the components are not deformed and the installation dimensions are correct. In addition, the installer should also check the pre-embedded bolts or cups of the steel column foundation on the premise that the strength of the foundation concrete meets the specifications. If the position of the foundation and the height of the elevation are found to be deviated, the part should be recorded. In order to adjust the position of the steel column.
All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.
All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.
The following question we need to know before making the price. Just feel free to fill what you know.
1 | Location (where will be built?) | _____country, area |
2 | Size: length*width*height | _____mm*_____mm*_____mm |
3 | wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
4 | snow load (max. snow height) | _____kn/m2, _____mm |
5 | anti-earthquake | _____level |
6 | brickwall needed or not | If yes, 1.2m high or 1.5m high |
7 | thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former |
8 | door quantity & size | _____units, _____(width)mm*_____(height)mm |
9 | window quanity & size | _____units, _____(width)mm*_____(height)mm |
10 | crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |