Specifications
Brand Name :
Ruly Steel
Model Number :
Ruly0225
Certification :
SGS, BV, ISO
Place of Origin :
China
MOQ :
500 Square Meter
Payment Terms :
L/C, T/T, Western Union
Supply Ability :
20000 Square Meter Per Month
Delivery Time :
30 Days
Packaging Details :
As request
Application :
Metal Frame Construction, Industrial Steel Structures
Features :
Structural Steel Frame Construction
Raw steel material :
Q235B, Q355B
Type :
Steel Structure Construction
Working scope :
Design,Fabrication, Installation
Surface treatment :
Painting
Service life :
50 Years
Wall and Roof :
Steel cladding sheet
Description

Metal Frame Construction / Industrial Steel Structures / Structural Steel Frame Construction

Metal Frame Construction / Industrial Steel Structures / Structural Steel Frame Construction. We could contract the projects such as prefabricated steel structure warehouse, workshop, storage sheds, garage, hangar, chicken shed, car parking, showroom, office buildings, gym, dormitory building, high rise steel residence buildings, oli&gas project, power station, infrastructure buildings, etc. The major factors that effect the budget of prefabricated steel structure buildings are as below:

1. The height of the building, according to actual needs, increases the construction cost by 2% to 3% for every 10cm increase.

2. With or without crane tonnage, the choice of crane tonnage is also a big deal. If the tonnage selected is too large, it will cause waste of equipment, which is too small to meet the construction needs. Of course the price is different.

3. The protection structure, this is also the cost to consider, such as doors, windows, exterior walls and so on.

4. The type of the design structure of the factory building in the location, the building time, the use and other related factors.

5. The size of the construction area is the most essential influence. The large area must have a large amount of steel, and the cost of the steel structure factory building is relatively high. The width determines the area, and of course, it is also closely related to the structure of the plant design.

6. The length of the steel structure span, generally speaking, the larger the span, the lower the cost. Of course, the span is arranged according to its own needs, the design is different, the span is also different, of course, the requirements of the column distance are also very different.

7, the amount of steel required, the steel structure factory building cost has the greatest impact on the amount of steel. In addition to the source of the steel, the imported ones are also different from the domestic ones, and the color steel plates or sandwich plates are also different. On the same material, the area that has the greatest influence on the amount of steel is its area. The size of the building area determines the amount of steel used. Of course, the design of the structure is also within the scope of influence.

Material list and technical parameters:

Item name Specification Material Parameter Technical Treatment
Column H-section steel Q235B,Q345B Paint or Hot dip galvanized
Beam H-section steel Q235B,Q345B Paint or Hot dip galvanized
Bracing Steel rod,Steel pipe,Angle steel Q235B,Q345B
Purling C or Z shape, purling Thickness:1.8mm~3.0mm Q235B,Q346B Hot dip galvanized
Wall and roof panel EPS,Rock wool,Pu,Glass wool Sandwich panel or Single sheet. Steel T=0.426~0.8mm,insulation T=50~150mm Alu-zinc 150g, Fluorocarbon paint
Door Sliding or rolling door Steel or Aluminum sheet,T=1.0~1.5mm Paint or Hot dip galvanized
Window alloy-Glass,Aluminium alloy-shutter T=1.0~2.0mm Alloy
Lighting panel FRP, T=1.5mm or T=1.8mm Coefficient of thermal expansion:2.2x10-5/cm/cm/℃ Light transmittance 85%
Ventilator Turbine ventilator, and electric type Steel,stainless steel,PC Paint or Hot dip galvanized,304
Gutter Galvanized or stainless steel plate T=2.0mm Hot dip galvanized,304
Downpipe PVC pipe,Color steel pipe T=0.5mm Φ110,160,200 Paint
Bolt Ordinary, high strength 10.9S,4.8s Hot dip galvanized
Anchor bolt Steel rod M24,M27 M30 Q235B

Q235B Q355B Steel Structure Construction / Metal Frame Construction Painting Surface

Designing:

We have a dedicated steel structure engineering design department and research and development department, and established an independent and complete steel structure engineering design, optimization and deepening design system. Establishing engineering materials than building materials, we not only control the reliability and economy of the structure, but also the categories, performance, selection and combination of traditional enclosing materials and new maintenance materials. Our design is not only more applicable, safer, more economical, but also rich in architectural beauty.

Q235B Q355B Steel Structure Construction / Metal Frame Construction Painting Surface

How to install:

We will provide installation drawing for each project to guide installation. If you need, we could dispatch our engineer to construction site to guide installation or we install it directly.

Q235B Q355B Steel Structure Construction / Metal Frame Construction Painting Surface

How to quote:

The following question we need to know before making the price. Just feel free to fill what you know.

1

Location (where will be built?)

_____country, area

2

Size: length*width*height

_____mm*_____mm*_____mm

3

wind load (max. wind speed)

_____kn/m2, _____km/h, _____m/s

4

snow load (max. snow height)

_____kn/m2, _____mm

5

anti-earthquake

_____level

6

brickwall needed or not

If yes, 1.2m high or 1.5m high

7

thermal insulation

If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much
lower than that of the former

8

door quantity & size

_____units, _____(width)mm*_____(height)mm

9

window quanity & size

_____units, _____(width)mm*_____(height)mm

10

crane needed or not

If yes, _____units, max. lifting weight____tons; max. lifting height _____m

Send your message to this supplier
Send Now

Q235B Q355B Steel Structure Construction / Metal Frame Construction Painting Surface

Ask Latest Price
Brand Name :
Ruly Steel
Model Number :
Ruly0225
Certification :
SGS, BV, ISO
Place of Origin :
China
MOQ :
500 Square Meter
Payment Terms :
L/C, T/T, Western Union
Contact Supplier
Q235B Q355B Steel Structure Construction / Metal Frame Construction Painting Surface
Q235B Q355B Steel Structure Construction / Metal Frame Construction Painting Surface
Q235B Q355B Steel Structure Construction / Metal Frame Construction Painting Surface

Qingdao Ruly Steel Engineering Co.,Ltd

Verified Supplier
7 Years
shandong, qingdao
Since 2009
Business Type :
Manufacturer, Exporter
Total Annual :
15 Million-20 Million
Employee Number :
100~110
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement