0.3-0.5mm Light Keel Ceiling T Bar Suspended Ceiling Grid Roll Forming Machine
T Grid Roll Forming Machine Technical Parameter
Items | Specifications | |
Material of coil | Material Thickness | 0.3-0.5 mm galvanized PPGI |
De-coiler | Weight | 3 tons manual |
Knurls | Two sides | 1 sets of roll |
Forming system | Rolling Speed | 10-15 m/min |
Roller Stations | About 16 stations forming | |
Roller Material | Gcr15 Steel with quenching | |
Shaft Material | 45# Steel Diameter 75mm shaft
| |
Maim Motor Power | 7.5 kw | |
Hydraulic cutting Power | 4 kw | |
Cutting system | Material Of Cutting | CR12 with quench treatment |
Hardness | HRC58-62 | |
Tolerance | +-1.5mm | |
Cutting blade | 1 set of cutting blade | |
Electrical control system | Electric Source | 380V, 50HZ,3 phase
|
Control System | PLC with touch screen Japanese Panasonic and Yaskawa Brand | |
Joint system | stations | About 5 stations |
Weight | TON | About 3 tons |
Way Of Drive | Gear box | |
Size of machine | mm | Length 7500mm* Width 800mm* Height 800m |
Machine’s Components
3 tons manual uncoiler | 1set |
Hydraulic punching device | 1set |
Main roll forming systerm | 1set |
Hydraulic cutting | 1set |
Hydraulic station | 1set |
PLC control table | 1set |
Locking device for joints | 1set |
Final product runout table | 1set
|
Working Flow of Roll Forming Machine
Decoiler—feedingwithguide—Rollforming——hydraulicPunching——Cutting—Products collecting
Standard Profile drawing of product
Payment terms and after-sale service
1) FOB Shanghai
2) Payment: 30% T/T deposit, and pay the balance before shipping.
3) Delivery time: 60 working days.
4) Guarantee period: 12 months limited warranty starting from date of delivery. Shipping cost for parts to be replaced during warranty period have to be borne by the customer.
5) Installation and training:
1. If buyers visit our factory and check the machine, we will teach you how to install and us the machine, and also train your workers/technician face to face.
2. Without visiting, we will send you user manual to teach you to install and operate.
Exhibition New:
You are warmly invitated to visit our booth at 2017 Thailand International Building Materials Exhibition at Bangkok May 2nd-7th, our booth No is N603-3; Mosbulid, time is from 4th, April to 7th, April, and our booth number is U1, Hall 7.4
Exhibition name:2018 China (Guangzhou) international integrated housing Expo
Date:15-17th,May
Place:Guangzhou Pauli exhibition hall
Number:H915 and H916