Steel silo roll forming machine
Technique parameter
1 Materials : 0.8-4mm galvanized G450 coating coils, 275 to 450 mpa yield.
Feeding width: 1290 for 4mm 1293 for 2.5mm 1297 for 0.8 mm
2 Forming steps: about 18 stations
3 Material of rollers: Gcr15 steel precision-machined, high frequency quenching HRC58-62
4 Material of main shaft : 45# high quality steel (diameter>¢50)
5 Cutting: hydraulic cutting; quenching HRC58-62
6 Electronic control: PLC control Panasonic Brand
7 Dimension of machine: 11500mmX1350mmX800mm
8. Working speed:12-15m/min
9. Drive system: gear box drive
10. main motor power: 90kw
11. Punching moulds: 3 sets of punching dies at one time
12. Curving machine: Curving continuously to make the sheets straight, the min Radius 1.8m,
the Radius can be adjustable.
13. Cutting: Hydraulic cutting
14. Hydraulic station power 55kw, the pressure 25-30Mpa.
15. Out table: lift auto stacker
16. Total Power 130kw
Machine List
Machine List | Qty |
5 ton passive decoiler | 1 set |
Feeding&leveling device | 1 set |
Gear box drive system | 1 set |
Main forming machine | 1 set |
Curving device | 1 set |
Hydraulic cutting device | 1 set |
Out table | 2 sets |
PLC control system | 1 set |
Hydraulic station | 1 set |
Advantage of machine
During the warranty period, maintain and change the spare parts for the customers for free (except for the instrument damage caused by human factors or natural disasters. ) And provide technical support for life-long.
We can design and manufacture the machine according to clients' request! Our machines have passed CE, Guaranteed quality. Please send us the enquiry with Profile Drawing.
Working Flow of Steel Silo
Decoiler--Feeding with guide--Straightening device--Main roll forming machine--Curving--Out put table
Photo Gallery
Loading pictures
After-sale Serive
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)