GCR15 Roller Material Rack Rolling Machine , Shelf Cold Forming Machine With Cr12Mov
Name | Description |
Suitable raw material | 0.7-1.2mm galvanized coil S235JR |
Material width | 200-600mm |
Forming stations | 18 stations |
Material of Roller | Gcr15, precision-machined, high frequency quenching HRC58-62, diameter of rollers: >150 |
Material of Main Shaft: | 45# high quality steel (diameter>50) |
Driven system | Chain Driven 1.5 inches |
Chains’ material | 45# steel, high frequency quenching, circular pitch: 38.1; number of teeth: 13 |
Cutting | Hydraulic Cutting Cr12mov |
Material of Cutting Knife | Cr12Mov, Quench HRC58-62 |
Hydraulic Station Power | 4KW |
Control system | PLC Panasonic with touch screen |
Rack Shelf Machine Components
Main Components | |
De-coiler | 1 set |
Leveling device | 1 set |
Roll forming machine | 1 set |
Punching device | 2 sets |
Hydraulic cutting and bending device | 1 set |
Hydraulic station | 1 set |
PLC control box | 1 set |
Safety cover | 1 set |
Ran out table | 2 sets |
Control panel | 1 set |
Working flow of Rack Shelf Machine
De-coiler—→Level device —→ Hydraulic punching notch—→Main roll forming machine—→Hydraulic cutting&Bending—→ Run out table
Advantages of Heavy Duty Pallet Racking
1.It is suitable to be used in factories, manufactures and warehouse
2.Size(L*W*H): 1200/1500/2000*450/600/1000*1800/2000/2500mm
3.Perfect for storing categorized products in a neat and tidy way
4.heavy-duty shelf set for warehouse shelving
5.Strong structure
6.Easy installation
7.Customization is acceptable
1. Does one machine can only produce one size?
Not exactly, it depends on which profile the customer want to produce.
2. Do you have after-sales technical support?
Yes,we are happy to give advice and also have skilled technicians available to maintain the machine overseas to customers’ workshop if needed.
3. You are trading company or factory?
We are Manufacturer, and we export our machine by ourselves.
4. Do you provide customized?
Sure, we can design the machine according to the requirement and profile drawing you provide. Our engineers can offer the best professional solution to our worldwide clients.
5. How to visit your factory?
By high speed train from Shanghai to East Wuxi (Wuxi station), half an hour.
6. What's the warranty period?
18 months warranty period, starting from the date of the successful installation and commissioning of the equipments at the Buyer’s Installation site.