Galvanized 5mm Thick U Channel Roll Forming Machine for Highway Guardrail
Working flow
Decoiler-----feeding----- leveling ------roll forming ------ punching-----cutting----output table
Machine Component
De-coiler | 1 set |
Leveling device | 1 set |
Forming machine | 1 set |
punching device | 1 set |
Cutting device | 1 set |
PLC control box | 1 set |
Hydraulic pump station | 1 set |
Production support table | 1 se |
Parameter
1. DECOILER
(1)Max. capacity: 5t
(2)Inner Diameter: Φ450 – Φ550 mm
(3)Out Diameter: 1500 mm
2. LEVELING DEVICE
(1)Rollers for Leveling: 5 rollers
(2)Material for Rollers: 45# steel polished and coated with chrome HRC55-60°
(3)Hardness for Heat Treatment: HRC55 – 60°
3. ROLL FORMING MACHINE
(1) Material Thickness: 5 mm
(2) Rollers: 13Groups
(3) Material for Rollers: Gcr15# steel polished and coated with chrome HRC55-60°
(4) Material for shaft: high grade No.45 steel after treatment
(5) Diameter of shaft: 100mm
(6) Frame panel thickness: 20mm
(7) Bottom frame: 36# H-section steel
(8) Motor Power: 15 kw x2
(9) Rolling Speed: 8-12 m / min
(10) Transmission type: gear box
4. CUT-OFF DEVICE
(1) Material for Cut-Off Modular: Cr12 steel after treatment
(2) Hardness for Heat Treatment: HRC55 – 60
(3) Motor for Hydraulic Stand: 11 kw
6. ELECTRONIC CONTROL SYSTEM: PLC 1 SET
(1) Type: PLC Frequency Control System with touch screen
(2) PLC Brand: Delta
(3) Encoder Brand: Omron
(4) Length Error: ±1mm
(5) Language: English and Chinese
(6) Voltage: 380v/50HZ, 3Phase (it depends on customer requirement)
Machine Photos
Installation and training:
1 | If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face. |
2 | Without visiting,we will send you user manual and CD to teach you to install and operate. |
3 | If buyer needs our technician to go to your local factory,please arrange board and lodging and other necessary things. |
RFQ
Step 1: Tell us your requirements
Step 2: Quoataion will be sent based on your requirement. Solution will be recommended to you as the alternative
Step 3: Negotiate and confrim each details for goods, trading terms and so on, get agreement and sign contract.
Step 4: Advanced payment and production
Step 5: Factory Examine Goods/ rectify and reform to meet the requirements of contract.
Step 6: Balance payment and shipping
Step 7: Handing Shipping files to help clients get goods from transporter in time.
Step 8: Clients get goods and go into warranty time.