Corrugated Zinc Coated Metal Sheet Roof Roll Forming Machine Electrical System
Machine components
De-coiler------------------------------------------1set
Forming machine--------------------------------1set
Cutting device -----------------------------------1set
PLC control box ---------------------------------1set
Hydraulic pump station-------------------------1set
Production support table-----------------------1set
Parameter
Manual Un-coiler | Max Capacity: 5000kgs Inner diameter of coil: 400-600mm Manual with brake |
Leveling Device | Ensure the material level and straight The width can be adjusted |
Auto Main Forming System | Max Feeding width:1220 mm Product width: 1000 & 1020 mm Thickness of sheet: 0.2-1.0mm Motor Power: 5.5 kw forming system Roller material: C45 steel Diameter of shaft: Upper level 95 mm Down level 95 mm Forming station: Upper level 12 stations. Down level 12 stations. Base Frame: 360 H steel welded.. |
Hydraulic Cutting Device | Cutting way: pause to cut. Oil pump station 1set. Hydraulic power: 4 kw hydraulic system. Blade Material: CR12 with heat treatment HRC60-62. |
Electrical System | Control system: HMI & PLC control panel. Power: 440V 50Hz (as per local requirement) |
Run-out Table | Frame: 8# steel groove welded Roller type. Quantity: 1 pc |
Machine Photo
Packing& Loading
After-sales service
Technical Support
Fully providing technology supports both within and after the warranty period. Feed back to our customers at the first time.
Spare Parts
Promptly providing spare parts and wearing parts.
Upgrade
Improve technology and upgrade of equipments.
sandwich panel production line good price
RFQ
A: Please look at my contact card. You can talk to me anytime. Or send me enquiry email, I will reply you in 24 hours and offer the optimum solution to you
A: Engineers available to service machinery overseas. But the customers/buyer should pay for installation and commissioning fee 80$/day to our point account. We will provide the technical support for the whole life of the equipment and free training.
A: 1. Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
2 Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),then we can pick up you.A: Our company has been producing roll forming machines for almost 20years.We have rich experience for manufacturing and designing the machine.