Steel Profile Double Layer Roofing Tiles&IBR Corrugated Sheets Making Roll Forming Machine
Technial Specifications
Production Name | Roofing Sheet Double Layer Roll Forming Machine |
De-Coiler | Manual Operation, Passively De-coiling |
Loading of De-Coiler | 5 T |
Frame of Machine | Welded with 300H Beam Steel |
Thickness of Wallboard | 20mm |
Guide Feeding Way of Forming | Side Direction Roller Type |
Forming Machine Type | Wallboard and Chain Drive |
Diameter of Shaft | ¢70mm |
Chain | 1'' |
Motor Power of Forming Machine | 3.0KW |
Line Speed of Forming Machine | 12m/min |
Steps of Forming Machine | 11 Steps, 13Steps(according to customer's profile drawing) |
Roller Material | Superior 45# Steel Forging |
Thickness of Chrome Plated | 0.05mm |
Hydraulic Station Motor | 3.0KW |
Hydraulic Station Oil Pump | Gear Pump |
Cutting Way | Hydraulic Cutting |
Cutting Blade Material | Cr12 |
Cutting Blade Heat Treatment | HRC58º-60 |
Rolling Thickness | 0.3-0.8 mm |
Feeding Width | 1000mm |
Frequency Changer | Tricrystal |
Computer Adopts PLC | Panasonic, Computer Operation Panel Adopts Touch Screen |
Voltage | 380V/50HZ/3 Phase |
Our machine advantanges
For this roof press making machine, we have below advantage:
We choose a innovative way that already solved the glazed tile press step distance problem.
That method can ensure the each finished glazed tile will in a same distance step and can be well overlap one by one together.
This can save you a lot of money and time for you about this problem.
We are focus on machine detail design, will use many years experience to supplement the machine details and avoid some problems.
Will improve the machine service life.
Warranty
Two years, and we will provide technical support for wholelife of the equipment.
If some parts of machine broken within 2 year, we will give customer the spare parts for free. (include chain, bearing, roller,oil pipe, counting wheel) If more than 2 year, maybe some spare parts need to be charged. If machine can not work well, we can teach them online until the machine is perfect. If you need, we can go to your place to assist you. But you need to provide the cost of the engineer.
Packing&Shipping
a. Need one 20 or 40 ft container, according to your final drawing.
b. The main body of machine is fixed to container by 8mm diameter steel wire, rollers and shaft is
covered with anti-rust oil.
c. Spare parts in carton box.