Light Gauge Steel Frame Machine--C89 villa frame rolling forming machine is designed to make the C89 light frame in batch fully automatic.
Mainly it is used for drywall building part. the 89 model is generally used as the outer wall and the inner wall of the third floor or the partition wall (this equipment can be completed under the third floor); Generally used as an outer wall of six or less layers (in order to save materials, the outer wall is generally 140 models, and the inner wall is 89 models).
Working flow
Decoiler------feeding------roll forming---------punching-------cut to length-----output table
Profile Drawing
Machine Components
Name | Quantity(set) |
De-coiler | 1 |
Feeding guiding Device | 1 |
Roll Forming Part | 1 |
Hydraulic cutting Device | 1 |
Computer control box | 1 |
Hydraulic System | 1 |
Run-out table | 1 |
Parameter
Configurations | Manual Uncoiler ,Guiding Platform ,Coil Strip Leveler ,Main Body Of Roll Forming Machine, Electro-Motor, Hole-Punch Device ,Cutting Device ,Hydraulic Station ,PLC Control. |
Control System | PLC Panasonic Inverter |
Main Frame | 350mm H-Beam |
Main Power | 7.5kw |
Pump Power | 5.5kw |
Power Supply | 3-Phase,380V,50Hz |
Forming Speed | 30-35m/min |
Hydraulic Pressure | 18-20MPa |
Forming Size | 80mm |
Feeding Thickness | 1.5-3.2mm |
Roller Station | 12 Stands |
Roller Diameter | 60mm |
Backboard Thickness | 16mm |
Chain Size | 66mm |
Cutter Standard | Cr12 |
Roller Standard | Cr12 |
Cr-Plating Size | 0.05mm |
Overall Size | 9500×1400×1350mm |
Total Weight | 6T |
Machine Picture
Re-sale Service :
1. Send you invitation letter, if you want to visit our factory and check the machines.
2. Good Quality + Competitive price + Quick Response + Reliable Service.
Selling Service :
1. Email the production schedule and make prompt delivery.
2. Count the cheapest shipping cost, look for the fastest forwarder and send relevant documents promptly.
3. Be here for your service at any time.
After-sale Service :
Any questions, contact us by WhatsApp or Telephone.
RFQ
Step 1: Tell us your requirements
Step 2: Quoataion will be sent based on your requirement. Solution will be recommended to you as the alternative
Step 3: Negotiate and confrim each details for goods, trading terms and so on, get agreement and sign contract.
Step 4: Advanced payment and production
Step 5: Factory Examine Goods/ rectify and reform to meet the requirements of contract.
Step 6: Balance payment and shipping
Step 7: Handing Shipping files to help clients get goods from transporter in time.
Step 8: Clients get goods and go into warranty time.