Automatic Scaffold Walk Board Rolling Forming Machine For Galvaized Iron Sheet
1.Machine Components
S.N | Equipment name | Quantity |
1 | 3T hydraulic un-coiler | 1 set |
2 | Leveling device 600mm | 1 set |
3 | Servo feeding device 600mm | 1 unit |
4 | Press machineJH21-125 | 1 unit |
5 | Main roll forming machine 20 stations | 1 set |
6 | Cutting holder | 1 set |
7 | Hydraulic station | 1 set |
8 | Control system ( including control box) | 1 set |
9 | Conveyor Out table | 1 unit |
10 | Spare parts | 1 package |
11 | Drive system | 1 set |
12 | Cutting dies | 2 sets |
13 | Punching die set | 2 sets |
2.Technical Parameter
1). Decoiler
* Decoiler Type: Hydraulic Decoiler
* Weight Capacity Of Decoiler: 3 Ton
* Hydraulic expanding
* Inner Diameter. Φ460-520mm
* Outer Diameter. Φ1400mm
2). Roll Former
* Axis Diameter: 90mm
* Forming Roller stand: 14 Groups or according to customer profile
* Main Axis material: First grade 45# steel, heated and quenched
* Roller material: GCr15 Steel, Quenched and heated process
* Drive Type: 1.5” Chain of transmission
* Chain material: 45#steel, HRC45-50
* Machine Frame stand: coloum stand
* Main Power: 11 KW
3) Cutting Device
* Cutting type: Hydraulic cutting
* Hydraulic pump station power:7.5 KW
* Hydraulic Blade and cutter material: Cr12Mov, quenching process 58-62
* Cutting length tolerance: 10M+/- 2.0 mm
4). Electrical System
* Voltage: 380V, 3 Phase 50Hz
* PLC Electrical control system: PANASONIC
* Length Controller: Encoder Frequency Control System
* Operation: Touch Screen
* Transducer: PANASONIC
5) Runout Table:
* Non-power type
3.Drawing:
4. Machine photos for reference:
5.Payment Term and condition
* Payment Term: 30 T/T in advance, 70% T/T before delivery
* Delivery Time: Within 30 Days after receipt of the down payment
* Warranty: 18 month and life-long maintainance
*Installation and debugging: We will send professional engineer to make installation and debugging, Buyer pay our engineer each one 100 USD/day, and provide accommodation, food and the round-trip ticket fee.
* Installation Days: about 5 days
* Transporting: 1x40ft container
6.FAQ:
1:How to play order:
Inquiry---confirm the profile drawings and price----confirm the PI---arrange the deposit or L/C---then OK
2:How to visit our company:
Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),then we can pick up you.
3:When we exported the machines:
We have beening making and exporting the machines since from the year of 1998.
4.What's the after- sale service:
we sent technician to your country to fix the machine.The buyer should bear all the cost including:
visa, round trip ticket and suitable accommodation, also buyer should pay the salary EVERY DAY.