Specifications
Brand Name :
LANGE
Place of Origin :
HeBei China
Price :
Negotiable
Payment Terms :
L/C, T/T, D/P, D/A
Supply Ability :
18,000 square meter per month
Delivery Time :
90 days
Packaging Details :
containers
Application: :
Warehouse, Workshop, Factory Building
Length: :
Customers' Requirements
Working Scope: :
Design,Steel Structure Fabrication, Installation
Anti-Fire :
High Anti-Fire
Size: :
Customers' Requirements
Feature :
Anti Corrosion
Description

Steel Structure Prefab Steel Construction Of Stadium Activity Center Building

Design Prefab Steel Structural Frame Steel Construction

A prefab steel construction of a stadium activity center building is a pre-engineered building that is designed and fabricated using steel components in a factory setting. The pre-fabricated components are then transported to the construction site and assembled on-site to create the finished building.

Stadium activity center buildings are typically large, open structures that are designed to accommodate a wide range of activities, such as sporting events, concerts, and other performances. The use of prefab steel construction for these buildings offers several advantages over traditional construction methods.

In summary, a prefab steel construction of a stadium activity center building is a fast, customizable, and sustainable construction option that offers many advantages over traditional building methods. It is a durable and low-maintenance choice that can be used in a wide range of applications, and offers significant cost savings over the life of the building.

No. Item Details of steel structure building or steel frame
1 Material Material carbon structural steel
2 Produce Lead time Normallly 45days after down payment, also according to quantity.
3 Quality Certification Quality certificate from factory, the third party by client request.
4 Dimensions Length H beam: 4000-15000mm
5 Thickness: web plate: 6-32mm
6 wing plate: 6-40mm
7 Height 200-1200mm
8 Color According to customers
9 Size MOQ is 1000 m2, width * length * eave height,

High Anti Fire Prefab Steel Construction Of Stadium Activity Center Building

All the structure components, panels,bolts and sort of accessories will bewell packed with standard package suitable ocean transportation and loaded into 40’HQ.

All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers,who will prevent the goods to be damaged.

High Anti Fire Prefab Steel Construction Of Stadium Activity Center Building

Send your message to this supplier
Send Now

High Anti Fire Prefab Steel Construction Of Stadium Activity Center Building

Ask Latest Price
Watch Video
Brand Name :
LANGE
Place of Origin :
HeBei China
Price :
Negotiable
Payment Terms :
L/C, T/T, D/P, D/A
Supply Ability :
18,000 square meter per month
Delivery Time :
90 days
Contact Supplier
video
High Anti Fire Prefab Steel Construction Of Stadium Activity Center Building

Dongguang Lange Equipped Housing Co., Ltd.

Verified Supplier
4 Years
hebei, cangzhou
Since 2020
Business Type :
Manufacturer, Distributor/Wholesaler, Exporter
Total Annual :
1000000-5000000
Employee Number :
100~200
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement