The performance advantage of steel structure is better than that of concrete building.
1. Fast build: All general prefabricated warehouse come pre-welded, pre-drilled and pre-punched at our factory. just need to connect by bolts with the accuracy of steel components , no need to weld in construction site. One 1000 sqaure meter prefabricated warehouse just needs around 25 days to install with 5 workers.
2. Low cost: Requires less maintenance than other traditional building method. Unit price range from FOB Qingdao USD19.99 to USD80 per square meter, it cost about 50% less than traditional construction. Moreover, 98% of all steel structure can be recycled into new steel products without reducing physical properties.
tem | Specification |
Size | 5800*2400*2896mm(13.92m2) |
Steel Structure | Prefab steel structure |
Wall Panel | 0.326/0.376/0.426/0.476mm THC steel sheet |
50/75/100mm THC EPS / rock wool / glass wool / pu sandwich panel | |
Wall Color | White grey and more(Depending on quantity) |
Roof | 0.326/0.376/0.426/0.476mm THC steel sheet |
50mm THC EPS / rock wool / glass wool / pu sandwich panel | |
Door | 0.326/0.376/0.426/0.476mm THC steel sheet |
50mm THC EPS / rock wool / glass wool / pu sandwich panel with lock | |
Window | Aluminum PVC sliding door with security bar |
Floor | MGO / cement fiber floor board |
Forklift pockets are designed in bottom frame for easy moving. Four container corners ensure cabin can be locked with shipping container during sea transportation.