Specifications
Brand Name :
ZTRFM
Model Number :
ZTAC
Certification :
CE, SGS
Place of Origin :
China
MOQ :
1 set
Price :
under discuss
Payment Terms :
L/C, D/A, T/T, Western Union
Supply Ability :
30 sets per month
Delivery Time :
60 working days
Packaging Details :
Nude with anti coil coating and plastic cover
Material :
galvanized steel, cold rolled steel, and carbon steel.
Thickness :
2.5 mm to 4.0mm
Power :
22 kw X 2
Roll forming Speed :
12 m/minute
Cutting Tolerance :
+/-2mm
Roller Material :
Gcr15 (HRC55℃~60℃)
Voltage :
Customize
Decoiler :
Manual or hydraulic
Description

Highway Guard Rail Two Wave or W beam Cold Rolled Forming Machine

Highway Guard Rail Two Wave or W beam Cold Rolled Forming Machine is designed to make the W beam or two wave guardrail in batch fully automatically.Highway collision avoidance facilities, isolation and other facilities. Mainly used for traffic security projects such as highways, primary and secondary roads, provincial roads, county roads and rural road scenic spots, large parking lots, etc.

SGS Highway Guard Rail Two Wave Or W Beam Roll Forming Machine 12m/Min

Here are some highway guardrail drawing profiles for your reference:

SGS Highway Guard Rail Two Wave Or W Beam Roll Forming Machine 12m/Min

SGS Highway Guard Rail Two Wave Or W Beam Roll Forming Machine 12m/Min

Highway Guard Rail Two Wave or W beam Cold Rolled Forming Machine:

SGS Highway Guard Rail Two Wave Or W Beam Roll Forming Machine 12m/Min

For the guardrail machine design, we have the following types for your reference:

1. Two wave guardrail rolling forming machine.

2. Three wave guardrail rolling forming machine.

3. Two and three wave guardrail rolling form machine.

As to the machine design whole working flow, it could be designed as before shearing and after shearing.

The difference of before shearing and after shearing lies in that:

Before shearing will be a little faster than the after shearing.

If two types supported, no need to change the cutting blade.

But before shearing end and start will be a little sizes error.

For the transmission part, we can use the gearbox type or the middle plate chain transmission

SGS Highway Guard Rail Two Wave Or W Beam Roll Forming Machine 12m/Min

Working flow of guardrail rolling forming machine :

Uncoiling --> Alignment guiding roller -->9 rollers leveling --> hydraulic punching hole --> Panel Transport table --> Swift sheet feeding --> Photoelectrical switch --> Roller guiding table --> 15 stations roll forming --> Finished product support table.

Features for Highway Guard Rail Two Wave or W beam Cold Rolled Forming Machine

1. As to the decoiler, you can choose manual one or the hydraulic one.

2. For the roller material, we use G2 or SKD11 material for long time to use.

3. For the frame, we use the molding frame.

4. For the punching, we use before punching and PLC control.

5. For the based frame, solid steel and steady and long time to use.

6. Before shearing and after shearing both optional.

SGS Highway Guard Rail Two Wave Or W Beam Roll Forming Machine 12m/Min

SGS Highway Guard Rail Two Wave Or W Beam Roll Forming Machine 12m/Min

Highway Guard Rail Two Wave or W beam Cold Rolled Forming Machine working videos for your reference:

Send your message to this supplier
Send Now

SGS Highway Guard Rail Two Wave Or W Beam Roll Forming Machine 12m/Min

Ask Latest Price
Brand Name :
ZTRFM
Model Number :
ZTAC
Certification :
CE, SGS
Place of Origin :
China
MOQ :
1 set
Price :
under discuss
Contact Supplier
SGS Highway Guard Rail Two Wave Or W Beam Roll Forming Machine 12m/Min
SGS Highway Guard Rail Two Wave Or W Beam Roll Forming Machine 12m/Min
SGS Highway Guard Rail Two Wave Or W Beam Roll Forming Machine 12m/Min
SGS Highway Guard Rail Two Wave Or W Beam Roll Forming Machine 12m/Min
SGS Highway Guard Rail Two Wave Or W Beam Roll Forming Machine 12m/Min
SGS Highway Guard Rail Two Wave Or W Beam Roll Forming Machine 12m/Min

RFM Cold Rolling Forming Machinery

Verified Supplier
8 Years
hebei, cangzhou
Since 2014
Business Type :
Manufacturer, Exporter, Trading Company
Total Annual :
50000000-6000.0000
Employee Number :
20~50
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement