Simple Structure Fast Bridge Emergency Bridge Mechanized Bridge
Simple Structure Fast Bridge Emergency Bridge Mechanized Bridge With an axle load of up to 17 tons or a tracked load of up to 60 tons and 21m Length is mainly used to raised a bridge with a width of 3.3m and a length of 21m long ,and all sorts of vehicles to go across small medium rivers and dry gaps rapidly. and make sure sort of emergency equipment carried by automobile and accomplishes erection and retrieval by erection vehicle.
Specifications for Heavy Mountain Bridge | |
Operator | 2-3 |
Erection | 10 min |
Max. longitudinal slope / lateral slope | ±10% / ±5% |
Allowable bank height difference | 5% |
Tracked / axle load | 55t / 17t |
Outline dimension (L*W*H) | 13*3.3*3.6m |
Gross weight | 32.5t |
Bridge weight | 10.5t |
Bridge length | 21m |
Negotiating length (on hard banks) | 19m |
Section length | 10.63m |
Bridge width (when expanding) | 3.3m |
Track width | 1.15m |
Section height | 0.95m |
End section height | 0.35m |