Twin Wall 6 Inch Twist Lock Insulated 45 Degree Bend For Fireplace Chimney System
Introduction:
The Ruilun Twin wall insulated twist lock chimney systems designed to meet the requirements for multi-fuel that operate under negative
conditions. The systems with a specific range of components and use twist-lock teeth to lock each other properly. The systems are CE approved
by Famous Italy Kiwa test lab under EN1856-1.
The twin-wall twist-lock chimneys is a factory-made and prefabricated double-wall insulated stainless steel chimney systems. Flues are full
welding with high performance.
This special design and construction provide high thermal resistance the test temperature reaches 1100 °C and the normal use can under
600 °C continuous.
1. Production Description:
Product Name: | Twin Wall 6 Inch Insulated 45 Degree Bend |
Series: | Double Wall insulated with Twist Locking |
Material: | Stainless 304(1.4301) / 316L (1.4404) |
Color: | This system is shiny stainless silver color |
Size: | 5'' (ID125mm/OD175mm) & 6'' ( ID150mm/OD200mm) |
Thickness: | 0.5mm (+/-0.04mm) suit for National steel standard |
Insulation: | High-density ceramic fibers insulation |
Certificate: | CE, ISO9001 |
Packing size: | Depend on the product's size |
Weight: | 0.5KG-4KG |
Application: | Wood fireplaces, Pellet stove, Fireplaces, Boiler, Generator, Wood Heater |
2. Related products pictures:
3. Packing and Delivery:
Packing details: Products packed with plastic bags and then into carton then packed into pallets.
Loading port: Shanghai Or Ningbo
Lead Time: 28 working days after confirming the order
4. Why Choose us?
(1) We are the manufacturer and supply OEM/ODM. Based on the customer's requirements and need.
(2) We are professional metal products and chimney systems which have more than 10 years of abundant experience in this industry.
(3) We always help customers solve the problems and insist on a win-win philosophy.
5. FAQ:
(1) Are you the trading company or the manufacturer?
We are the Manufacturer
(2) What are your payment terms?
T/T: 30% TT deposit and 70% TT balance See B/L loading or Before shipping
(3) How long is your lead time?
20 days after received the deposit.