Specifications
Brand Name :
boyu
Model Number :
BJJM5Q
Certification :
ISO9001
Place of Origin :
China
MOQ :
1set
Price :
Negotiable
Payment Terms :
L/C, T/T
Supply Ability :
1000sets/month.
Delivery Time :
15-35days
Packaging Details :
box
Product :
Cable Pulling Winch
Type :
Wire Rope Traction Winch
Pulling force(KN) :
50
Pulling speed(m/min) :
5
Power :
HONDA GASOLINE GX390 13HP
Weight (kg) :
190
Description

Transmission Line Stringing Tools Cable Pulling Winch 50kN Pulling Force

Model Gear Pulling force(KN) Pulling speed(m/min) Power Weight (kg)
BJJM5Q Slow 50 5 HONDA GASOLINE GX390 13HP 190
Fast 30 11
Reverse - 3.2
BJJM5C Slow 50 5 Diesel engine 9kw 220
Fast 30 11
Reverse - 3.2


It is used for tower erection and sagging operation in line construction. It can also be used for pulling conductor or underground cable. The winches are the construction tools of erecting electric circuits of high pressure electric transmission in the sky and laying electrical cables underground. It can complete the tasks of heavy-lifting and dragging such as erecting the wire. Testified by the experiments and practical uses, they have reasonable structure, small volume, light weight, strong power, nimble operation and convient transporting. Based on so many advantages.

Features:
1. Speedy and Efficient.
2. Safe and Reliable.
3. Compact structure.
4. Small volume.
5. Light in weight.
6. The wire rope can be directly wound on the winch.

Operation methods

1. Before turning on the machine, you must turn on the clutch first and put the racker for crosspiece - changing in the zero position.

2. When moving the crosspiece, you should be quick. Otherwise the brake won’t work well. When turning on the machine, you shouldn’t work too fiercely.

3. When changing the crosspiece position, you must turn on the clutch. Otherwise the gear will be damaged. After that, you should check whether the changing job is well done. Make sure you haven’t changed two crosspieces in one time.

4. If there is any difficulty during the process of changing crosspiece position, you shouldn’t try to complete the job forcefully. Instead you should use the hand installment to help you complete the job. Concrete procedure: using the spanner to move the hand installment to a position with a certain angle, then you can change the crosspiece position smoothly.

50kN Transmission Line Stringing Tools Cable Pulling Winch

Send your message to this supplier
Send Now

50kN Transmission Line Stringing Tools Cable Pulling Winch

Ask Latest Price
Brand Name :
boyu
Model Number :
BJJM5Q
Certification :
ISO9001
Place of Origin :
China
MOQ :
1set
Price :
Negotiable
Contact Supplier
50kN Transmission Line Stringing Tools Cable Pulling Winch
50kN Transmission Line Stringing Tools Cable Pulling Winch

Yixing Boyu Electric Power Machinery Co.,LTD

Verified Supplier
12 Years
Since 1997
Business Type :
Manufacturer, Exporter
Total Annual :
15000000-20000000
Employee Number :
150~200
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement