Servo Guiding Device Cable Tray Roll Forming Machine Long Time Service PLC Control
1. Main parameter
No. | main parameter of gutter roll forming machine | ||
1 | Suitable to process | Color steel plate | |
2 | Width of the plate | 300-900mm | |
3 | Rollers | 18-22rows | |
4 | Dimensions | 10.5*1.6*1.5m | |
5 | Power | 11+4kw | |
6 | Thickness of the plate | 0.5-1.2mm | |
7 | Productivity | 4-6m/min | |
8 | Diameter of the roller | 90mm | |
9 | Weight | About 8.0 T | |
10 | Voltage | 380V 50Hz 3phases | |
11 | Rolling material | Carbon Steel 45# | |
12 | Material of the cutting plate | Cr12 | |
13 | Processing precision | Within 1.00mm | |
14 | Control system | PLC control |
2. Punching and cutting Device
It used for punching the suitable holes and cut to target length of products.
Punching Type: Hydraulic Punching
Cutting type: Hydraulic cutting
Cutting material: Cr12
Hydraulic power: 5.5KW
Hydraulic Pressure: 16Mpa
3. Our Advantage
Our machine | Influence of the machine | |
Main forming machine body | High strength H300 or H350 steel. machine through milling machine after welding | Sturdy and durable, ensure the plate standard |
Material of the roller | GCr15 | Ensure the forming effect of the panel and the use age will be longer,the surface of the panel |
Material of the cutting | Cr12 steel with quenched treatment | Cutting is out of shape not easily and use age will be longer,the panel size precision |
Material of the active shaft | High grade No.45 forged steel, Shaft diameter is 80 or 75mm. | Improve the integrated mechanic feature of the shaft and keep product standard |
Control system | PLC control system,some elements are imported from Japan and Germany | Machine become more accurate and more stable |
4. Main Components of Cable Tray Roll Forming Machine
No. | Item | Quantity |
1 | Uncoiler | 1 Set |
2 | Servo Feeder | 1 Set |
3 | Hydraulic Punching Device | 1 Set |
4 | Cable Tray Roll Former | 1 Set |
5 | Hydraulic Cutting | 1 Set |
6 | Hydraulic Station | 1 Set |
7 | Ran-out Table | 2 Sets |
8 | PLC Control System Cabinet | 1 Set |
5. Layout of Cable Tray Roll Forming Machine
6. Our Services
1. Terms of Payment: 30% of the total contract value paid by T/T as down payment, the rest 70% of the total contract value to be paid by T/T after inspection by buyer in seller’s factory while before delivery.
2. Delivery: 30 days after receipt of advance payment
3. Service: we send technician to your country to fix the machine.The buyer should bear all the cost including: visa, Round trip tickets and suitable accommodation, also buyer should pay salary 80USD/day.
4. Warranty: 12 months limited warranty
5. During warranty: parts are free but buyer pay for the shipping fee.
7. Picture