Light Gauge Steel Framing System Steel Gutter Roll Forming Machine Simens PLC Control
1. Description of steel gutter roll forming machine:
Steel gutter roll forming machine is used for the production of the metal gutters, which are widely used in modern villas and multiple raises buildings. LBM is producing high-quality steel gutter roll forming machines and exports them to India, Vietnam, Indonesia, Thailand, Egypt, etc.
2. Main parameter of steel gutter roll forming machine
No. | Main Technical Parameters | |
1 | Suitable Raw Material | GI, GL, PPGI, PPGL Coil |
2 | Width | 200-600mm |
3 | Thickness | 0.4-0.6mm |
4 | Roller station | 24 stations |
5 | Dimensions | Approx 8.6*0.8*1.2m |
6 | Main Power | 11kw |
7 | Forming speed | 12~15m/min |
8 | Diameter of the shaft | 75mm |
9 | Weight | About 6.0 T |
10 | Voltage | 380V 50Hz 3phases |
11 | Rolling material | No. 45# with hard chrome and quenched |
12 | Material of the cutting plate | Cr12 Steel |
13 | Control system | PLC control |
3. Our advantages:
Our factory has more than 10 years of working experience in researching and selling. Products are well sailed all over the world, got many compliments from customers.
1). Germany COPRA software design
2). 5 engineers with more than 20 years of experience
3). 15 professional technician
4). 11 sets advanced CNC production lines on site
5). Passionate Team
6). Installation engineers can reach your factory within 6 days
7). 2 years maintenance and whole life technical support
4. Our Service
Installation service
a. After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
The installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before the seller’s technician's departure.
The buyer should arrange the accommodation, food, and traffic in the destination
Training period: 2 days. (we can supply training on the operation spot if buyer needs)
Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.
5. FAQ:
1. Q: Are you a manufacturer, trading company?
A: We are a manufacturer, and we have built up our company since 2007.
2. Q: Where is your factory located?
A: Our factory address is: No. 551, the Zhenze West Road, Huazhuang Street, Binhu District, Wuxi City, Jiangsu, China
3. Q: How can I get to your factory?
A: Our factory is near Shanghai Airport, we can pick you up at the airport. Or you can by plane direct to Wuxi airport. We can pick you up.
4. Q: If I will need to stay in your place for a few days, is that possible to book the hotel for me?
A: It’s always my pleasure, a hotel booking service is available.