Fully Automatic High Efficiency Door Frame Roll Forming Machine Made In China
1. Description of Door Frame Roll Forming Machine
This Door Frame Roll Forming machine can produce various kinds of Roll Formed Aluminum & GI Steel Door or Window frames.
The punching also can be designed according to your needs. the door frame surface will be very smooth and beautiful without any scratches on the surface.
LBM factory is manufacturing high-quality Door Frame Roll Forming Machines, and most of the machines are exported to foreign countries, such as India, Brazil, Argentina, Thailand, Philippines, Pakistan, Russia, Angola, Ethiopia, Ghana, Zambia, etc.
2. Technical Parameters of Door Frame Roll Forming Machine
Suitable material | Galvanized steel strip |
Main motor power | 7.5KW with Cycloidal reducer |
Hydraulic station power | 4KW |
Hydraulic oil | 36# |
Thickness of material | 0.8-1.5mm |
Diameter of the principal axis | Φ70mm |
Material expands width | 200mm-420mm |
Electric tension | 380V 3phase 60HZ |
Material of roller | GCr15 bearing steel HR58-60 |
Rolling galvanization thickness | 0.05mm |
Processing speed | 15-20m/min |
Processing precision within | 10m+/-1.00mm |
Material of cutting blade | Cr12 mold steel with quenched treatment |
Kind of drive | 1.5-inch chain link bearing model 6210 |
Roller station | 18 Rollers |
Dimension | 8.5m*0.9m*1.3m |
Weight | 5.5Ton |
Screen | 5.7-inch Taida screen |
PLC brand | Mitsubishi |
3. Main components of Door Frame Roll Forming Machine
Name | Quantity |
Uncoiler | 1set |
Coil sheet guiding device | 1set |
Main roll forming system | 1set |
Punching device | 1set |
Cutting device | 1set |
Hydraulic station | 1set |
PLC control system | 1set |
Support table | 1set |
4. Our Service
A. Foreign debugging
If you need it, we will arrange for our professional engineers to help you install and debug the machines well. The buyer should pay $100 per day
B. Guarantee period
The warranty will be a maintenance, maintain in the guarantee period of 18 months starting from delivery. Because of the quality of equipment during the guarantee period, we will provide the parts free of charge, which is in the conditions of correct operation. (Natural disasters or factors which can’t be forced by humans are excluded).
C. Training
During the installation and adjustment of the equipment, our engineers shall provide the training to the buyer’s personal request to operate and maintain the equipment. Including foundation construction, electrical works, hydraulic oil, safe operation, and non-standard safety items, testing material and etc.
5. FAQ
1). Q: Are you a manufacturer, or trading company?
A: We are a manufacturer, and we have built up our company since 2007.
2). Q: Where is your factory located?
A: Our factory address is: No. 551, the Zhenze West Road, Huazhuang Street, Binhu District, Wuxi City, Jiangsu, China
3). Q: How can I get to your factory?
A: Our factory is near Shanghai Airport, we can pick you up at the airport. Or you can by plane direct to Wuxi airport. We can pick you up.
4). Q: If I will need to stay at your place for a few days, is that possible to book the hotel for me?
A: It’s always my pleasure, a hotel booking service is available.