Fully Automatic Easy Operation High-Speed Steel Door Frame Roll Forming Machine
1. Description of Door Frame Roll Forming Machine
A door frame roll forming machine generally consists of a decoiler (a Hydraulic Decoiler is optional ), the main roll forming machine, a transmission system, a cutting tool, a hydraulic system, a hydraulic oil pump, a PLC control cabinet, and run-out tables
This Door Frame Roll Forming machine can produce various kinds of Roll Formed Aluminum & GI Steel Door or Window frames.
The punching also can be designed according to your needs. the door frame surface will be very smooth and beautiful without any scratches on the surface.
Lebron-Machinery is manufacturing high-quality door frame machines, and they are mostly exported to foreign countries, such as Australia, UK, Ireland, Mexico, Brazil, Israel, Dubai, Russia, India, Taiwan, Singapore, Malaysia, Thailand, Philippines, Myanmar, Vietnam, South Africa, Mozambique, Zambia, Zimbabwe, Nigeria, Egypt, Sudan, etc.
2. Technical Parameters of Door Frame Roll Forming Machine
Weight | About 6000kgs |
Size | About 7.5m*1.2m*1.0m (L x W x H) |
Suitable Material | Galvanized steel strip |
Thickness | 0.8~1.2mm |
Coil width | 240mm |
Yield strength | 235Mpa |
Rollers station | 18 Stations |
Roller Shaft Diameter | 75 mm |
Roll Forming Speed | 20-25m/min |
Production Speed | Approx.15m/min |
Roller Material | 45# steel, coated with chrome, quenched |
Cutter material | Cr12 mold steel, with quenched treatment |
Controlling system | PLC and Converter |
Electric power requirement | Main power: 7.5 KW |
Hydraulic power: 4 KW | |
Electric voltage | 380V 50Hz 3 Phase (as per local requirement) |
3. Main components of Door Frame Roll Forming Machine
Name | Quantity |
Uncoiler | 1set |
Coil sheet guiding device | 1set |
Main roll forming system | 1set |
Punching device | 1set |
Cutting device | 1set |
Hydraulic station | 1set |
PLC control system | 1set |
Support table | 1set |
4. Our Service
Installation service
After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
The installation period is around 5 days. The buyer should have been prepared for the steel sheet, and foundation position of the machine before the seller’s technician's departure.
The buyer should arrange the accommodation, food, and traffic in the destination
Training period: 2 days. (we can supply training on the operation spot if the buyer needs)
Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.
5. FAQ
1). Q: Are you a manufacturer, or trading company?
A: We are a manufacturer, and we have built up our company since 2007.
2). Q: Where is your factory located?
A: Our factory address is: No. 551, Zhenze West Road, Huazhuang Street, Binhu District, Wuxi City, Jiangsu, China
3). Q: How can I get to your factory?
A: Our factory is near Shanghai Airport, we can pick you up at the airport. Or you can by plane direct to Wuxi airport. We can pick you up.
4). Q: If I will need to stay at your place for a few days, is that possible to book the hotel for me?
A: It’s always my pleasure, a hotel booking service is available.