EMS Advantages:
1) Strict product liability, taking IPC-A-610 standard
2) All teams can speak fluent English
3) PDCA management tool
4) 100% E-test,100% visual inspection, including IQC, IPQC, FQC, OQC
5) 100% AOI inspection, including X-ray, 3D microscope and ICT
6) High-voltage test,impedance control test
7) ISO9001,ISO13485,IATF16949 and UL certified
8) No minimum order quantity
9) Focus on low to medium volume production
10) Quick and on-time delivery
PCB Assembly services:
1) Professional Surface-mounting and Through-hole soldering Technology
2) Various sizes like 1206,0805,0603,0402,0201 components SMT technology
3) ICT(In Circuit Test),FCT(Functional Circuit Test) technology.
5) PCB Assembly with Lead or non-lead RoHs
6) AI machine assembly,waving solering assembly lines
7) High density interconnected board placement technology capacity
About Suntek Group:
Suntek Group is a contract supplier in EMS field with one-stop solution for FCB/FPC assembly,Cable assembly,and Box-build assembly.
Suntek Electronics Co., Ltd,as the major facility, located in Hunan Prov,China;
BLSuntek Electronics Co., Ltd,as the new facility,located in Kandal Prov,Cambodia.
With ISO9001:2015,ISO13485:2016,IATF 16949:2016 and UL E476377 certified,
We deliver qualified products with competitive price to clients all over the world.
EMS PCB Quality Control:
FAQ:
Q1: What files do you use in PCB fabrication?
A1: Gerber, PCB. Auto CAD
Q2: How do you make sure the quality?
A2: Our Product is all 100% E-tested .PCB Assembly are with 100% AOI,ICT,FT and Visual checking,100% X-ray for BGA.
Q3: Can we visit your company?
A3: Of course,Welcome to visit our company, Suntek located in Xingsha Industrial Park, Changsha,Hunan province, China.
Q4: What is the lead time?
A4: It takes 3-5 working days for sample, 7-10 working days for batch production based on files and quantity. It takes 15-20 working days for PCB assembly.
Q5: Will you keep our information and files secret?
A5: Sure,It is our basic principle to keep business secrets to protect our customers' designs.NDA can be signed at any time.
Q6. How to work with you?
A6: -Email and send us the PCB layout file, BOM list
- We will provide reply confirmation within 12 hours and reply to the offer within 3-5 days.
- Waiting for your company to confirm the price, order and payment terms.
- We will proceed the order.
PCB Assembly equipments: