Reverse osmosis filtration system pharmaceutical waste water deep treatment
Client background:
Belarus project, a pharmaceutical company approached us, they have a finished project that has passed environmental expertise and they are currently looking for someone who can deliver all the equipment at once and set up its entire operation.
They have a small volume of wastewater - 23 m3/day. According to the technology, the water after flotation will be fed to filters (sand and sorption) after the reverse osmosis of the 1st and 2nd stage.
Place of Origin | CN;GUA |
Brand Name | JISHUI |
Model Number | HY seawater desalination |
Type | sea water desalination |
After-sales service provided | Engineers site service |
Feed TDS | <35000 PPM |
Living pure water TDS | <600 PPM |
Recovery efficiency | 40%~55% |
Control method | Full control or Semi control |
warranty | 1-3 years |
Booster pump | CNP/Grundfos |
Size | Customized by client's order |
Name | Sea water desalination |
The scheme of water purification there is as follows: wastewater enters the treatment of flotation, after which it is sent for post-treatment in sand-sorption filters (based on the daily output, hourly should be about 1.5m3-2m3 to have a reserve). Filters can be made of fiberglass, as they will be operated in a heated room. After passing the filters, the water enters the first purification on reverse osmosis (capacity 23m3/day) with membranes type ESPA. This membrane is selective to organic substances and multi-charge ions, and passes single-charged ions Na+ , Cl, which allows to reduce the volume of concentrate. The water purified at this stage will be further discharged into the sewage system. Concentrate after the first reverse osmosis (volume of about 2-3 m3/day) will go to the second reverse osmosis treatment station with a membrane type CPA or analogue.
Such a scheme is necessary for precise removal of drug compounds from the wastewater, as well as to reduce the volume of salt concentrate (to simplify the process of disposal).
According to the project the initial water will have approximately the following characteristics (before treatment by flotation):
Suspended solids: 700 mg/l
BOD: 1200 mgO2/l
COD: 3000 mgO2/l
Ammonium ion, nitrogen: 30 mg/l
Iron: 8 mg/l
Phenol: 0,5 mg/l.
synthetic surfactants: 900 mg/L.
Unfortunately, the production process is not yet up and running and we cannot say for certain the efficiency of the flotation process because we cannot perform the tests. Usually, according to our experience, suspended solids are reduced by 5-10 times or better, COD and BOD by at least 2 times, but usually also 5-10. The number of SPAW, iron is also reduced.
For discharge into the sewage system the requirements are not very stringent they could easily be achieved using only flotation and sand-sorption filters, but the customer is worried that not all drugs can be removed in this way and insists on installing reverse osmosis, as it is in the project.
Provide professional advice to customers:
Process flow:
Raw water tank - booster pump - multi-media filter - activated carbon filter - precision filter - sand and carbon water tank - scale inhibitor - primary high pressure pump - primary RO - product water tank (primary concentrated water tank)
Primary concentrated water tank - secondary pressurized magnetic - precision filter 5/1 µ - secondary high-pressure pump - secondary RO - product water tank (secondary concentrated water tank)
Second-stage concentrated water tank - third-stage pressurized magnetic - precision filter 5/1 µ - third-stage high-pressure pump - third-stage RO - product water tank (third-stage concentrated water tank)
FAQ:
Install and commissioning questions.
1st. All the plants will be commissioning and running well for 3 days then delivery. Installation video, photos, operating manual will send to client with the plants.
2nd. Clinet can come to factory for training how to installation and maintenance.
3rd. Some main parts will be guaranty two years.
4th. Engineer can go to overseas for installation and commissioning.
How to control quality?
1. Our company has passed ISO9001:2008 and SGS certification and all manufacture processes are conducted by the standard strictly.
2. All products adopt RO system simulation software design.
3. All auxiliary parts adopt international and Chinese famous brand products.
4. Before delivery time ,all complete sets will test run for 3 days continuously After quality inspection, they can be transferred to the customers
5. We have obtained many patents certification from government.
Send your Inquiry Details in the Below, Click "Send" Now!
ave obtained many patents certification from government.
More inquiries related to Water treatment please contact:
Connect:Eva
Mob& Wechat& WhatsApp: (+86)13532836525
Email: sales007@water-sy.com