It is used in the double-sided high-pressure gas cylinder to reduce the pressure supply. It can be continuously switched on both sides to achieve continuous gas supply and purge function. The maximum input pressure can reach 20.7Mpa(3000psi), corrosion resistance, clean shop assembly test, gas analysis Such as high purity gas.
Wl100 components: 1 double gauge R11 pressure reducer, 1 low-pressure one-piece ball valve, 2 diaphragm valves, and others are assembled by fittings and pipes.
Specifications
1 | Max. Inlet Pressure | 3000, 2200 psi |
2 | Max. Outlet Pressure | 25, 50, 100, 150, 250 psi |
3 | Working Temperature | -40°C ~ 74°C (-40°F ~ 165°F) |
4 | Flow Rate | see flow Curve Chart |
5 | Pressure Regulator Leakage Rate | 2 x 10-8 atm.cc/sec He |
6 | Cv | 0.14 |
Materials of Construction
1 | Body | stainless steel |
2 | Seat | PU, PTFE, PCTFE |
3 | Inlet Connection | 1/4″tube fitting, 1/4″FSR, 1/2″FSR |
4 | Outlet Connection | 1/4″ tube fitting , 1/4″FSR |
5 | Body of Diaphragm Valve | stainless steel |
Ordering Information
WL1 | 1 | 1 | 1 | S | H | 1 | 1 | -N2 |
Series | Function Options | Outlet Connection | Inlet Connection | Body Material | Input Pressure | Output Pressure | Gauge | Gas Options |
WL1 Series single side gas supply high pressure regulator system | 1.with emptying,purging distribution function | 1.1/4"NPT(F) | 1.1/4"Welding | S:stainless steel | H:3000psi | 1:25psi | 1.MPa | blank:none |
2.without emptying,purging distribution function | 2.1/4"tube fitting | 2.1/4"NPT(M) | C:nickel plated brass | M:2200psi | 2:50psi | 2.Bar/psi | N2:nitrogen | |
3.emptying,purging distribution+pressure sensor | 3.3/8"NPT(F) | 3.3/8"Welding | L:1000psi | 3:100psi | 3.psi/KPa | O2:oxygen | ||
4.with pressure sensor | 4.3/8"tube fitting | 4.3/8"NPT(M) | O:other | 4:150psi | 4.other | H2:hydrogen | ||
5.Others | 5.1/2"NPT(F) | 5.1/2"Welding | 5::250psi | C2H2:acetylene | ||||
6.1/2"tube fitting | 6.1/2"NPT(M) | 6:other | CH4:methane | |||||
7.Other | 7.1/4"tube fitting | Ar:argon | ||||||
8.3/8"tube fitting | He:helium | |||||||
9.1/2"tube fitting | Air:air | |||||||
10.Other |
|
FAQ
Q1. What about the lead time?
A:Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than
Q2. Do you have any MOQ limit ?
A: Low MOQ 1 pic.
Q3. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 5-7 days. Airline and sea shipping also optional.
Q4. How to proceed an order ?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.