Specifications
Place of Origin :
China
Brand Name :
weldsuccess
Certification :
CE
Model Number :
ZHJ18
MOQ :
1set
Price :
Negotiable
Packaging Details :
Seaworthy Packing
Delivery Time :
30days
Payment Terms :
L/C, T/T
Supply Ability :
5sets/month
Name :
h beam welding production line
Type :
Automatic
Weight :
Depend
Application :
H Beam production
Usage :
Welding Machine,H beam welding
Description

Integral H Beam Welding Line for Assembly , Electron Beam Welder

Quick Details

  • “Beam Welding Line” automatic, two heads submerged arc-welding lines for T / I girder beam.
  • 2sets of American Lincon DC-1000, NA-3S SAW welding system to ensure good welding quality;
  • Japan Mitsubishi PLC controller;
  • Hydraulic type post deformation device to straighten the beam;
  • The beam is fed into the machine and both sides of the beam are welded simultaneously.
  • Save space and economize workshop; shorten the production time and improve the efficiency;
  • Economize the investment of crane equipment and operator;

2. Main Parameters

Model ZHJ18
Suitable web height mm 200—1800
Suitable web thickness mm 6—32
Suitable flange width mm 200—800
Suitable flange thickness mm 6—40
Straightening thickness mm 6—35
Fillet height mm ≦8
Work-piece length mm 4000—15000
Feeding speed m/min 0.2—2 (VFD)
Input conveyor m 3conveyorss, each 2.6m (one powered)
Output conveyor m 11.5m, including lift conveyor
Machine power kW 18.1
Power supply AC380V, 50HZ, 3P or tailor made
Above are our standard models and parameters, and it can be designed and manufactured on request.

*We reserve the right to alter specifications without prior notice.

3. Introduction

H-beam combination workstation is used for H-beam or T-beam assembly, welding and straightening. It centralize the assembly, welding and straightening functions on one machine which saves space and economize workshop.Reduce workflows: shorten the production time and improve the efficiency. Economize the investment of crane equipment and operator.

  • These machines are specifically designed for the manufacture of welded “T” and double “T” girder-beams with parallel or converging flange.
  • They enable the welding to be carried out on items with the web located vertically and without any need for tacking.
  • Tacking will only be required at the top in order to obtain the proper angle between the web and the flange.
  • When double “T” beams are being manufactured, once the first flange has been welded, the beam is flipped over and fed back into the unit once again.
  • This machine is capable of welding both symmetrical and non-symmetrical beams without the need for tacking;
  • A flange post-deformation device mounted at the machine exit enables the machine to compensate for any flange deformation resulting from the welding process.
  • This device is easily adjustable to handle various flange dimensions and a variety of different deformable thicknesses up to a maximum of 40 mm at maximum width.
  • The welding line can be equipped with a control PLC from Mitsubishi.

4. Reference Photos

0.2-2m/Min VFD H Beam Welding Line For Assembly / Electron

0.2-2m/Min VFD H Beam Welding Line For Assembly / Electron

0.2-2m/Min VFD H Beam Welding Line For Assembly / Electron

Send your message to this supplier
Send Now

0.2-2m/Min VFD H Beam Welding Line For Assembly / Electron

Ask Latest Price
Place of Origin :
China
Brand Name :
weldsuccess
Certification :
CE
Model Number :
ZHJ18
MOQ :
1set
Price :
Negotiable
Contact Supplier
0.2-2m/Min VFD H Beam Welding Line For Assembly / Electron
0.2-2m/Min VFD H Beam Welding Line For Assembly / Electron
0.2-2m/Min VFD H Beam Welding Line For Assembly / Electron
0.2-2m/Min VFD H Beam Welding Line For Assembly / Electron

ZHANGJIAGANG FLAME MACHINERY CO.,LTD.

Active Member
6 Years
hebei
Since 1999
Business Type :
Manufacturer
Total Annual :
3000000-5000000
Employee Number :
100~120
Certification Level :
Active Member
Contact Supplier
Submit Requirement