zlp630/800 suspended working platform building gondola cleaning equipment
To confirm the quality of goods, we choose the best material, some spare parts of hosit and safety lock we cast our brand.
With the unique design of wire rope clamping alarm device , it reduce the damage of hoist . When the wire rope is clamped , the alarm device rings, the hoist stops working.The important components of hoist ,the warranty is 5~6 years, such as gear.
All the spare parts are produced by ourselves, no matter how long you have purchased, even if it has been10~20 years,the spare parts will be supplied in time . we are mufacturer , not like some factories that purchase the components from other factories, and then install in their own factory.
1.Structure of Suspended Platform
(1) WorkingPlatform (2) Hoist Assembly (3) Safety Lock
(4) Electric Control Panel(5) Suspension Mechanism(6) Cable(7) Wire rope
2. Usage of Suspended platform
(1) Facade maintenance,paiting and cleaning of high building
(2) Window cleaning and installation
(3) Construction inspection and maintenance of big-size tanks,chimneys ,dams, bridges
(4) Maintenance , cleaning ,painting of big ship
Specifications | |||
Type | ZLP630 | ZLP800 | ZLP1000 |
Rated Load | 630kg | 800kg | 1000kg |
Lifting speed | 9.3m/min | 8.5m/min | 8.3m/min |
Lifting height | 100m | 100m | 100m |
Hoist | LTD63 | LTD80 | LTD80sdrive |
Voltage-3Phase | 380V(415V/220V) | 380V(415V/220V) | 380V(415V/220V) |
Frequency | 50Hz/60Hz | 50Hz/60Hz | 50Hz/60Hz |
Power | 1.5kw*2 | 2kw*2 | 2.2kw*2 |
Safety Lock | LS30 | LS30 | LS30 |
Control Panel | Schneider or CHNT | Schneider or CHNT | Schneider or CHNT |
Platform Sise (LxWxH) | (2+2+2)x0.69x1.18m | (2.5+2.5+2.5)x0.69x1.18m | (2.5+2.5+2.5)x0.69x1.18m |
Wire Rope | 4pcsx100m 4x31SW+FC D=8.3mm | 4pcsx100m 4x31SW+FC D=8.3mm | 4pcsx100m 4x31SW+FC D=8.6mm |
Cable | (3x2.0+2x1.0mm2)100m | (3x2.0+2x1.0mm2 )100m | (3x2.0+2x1.0mm2)100m |
Counter Weight | 1000kg | 1000kg | 1000kg |
01.Which payment terms can we accept ?
Normally we can accept T/T, L /C, Western Union, sometimes D/P
1.T/T-----30% down payment is required in advance , 70% balance shall be settteled before
shipment or against the copy of original B/L .
2. L/ C----A 100% irrevocable L /C without "soft clause" can be accepted
02.How long will our price be valid ?
1.The rate of Usd dollars-----RMB varies significantly according to the intemational currency
exchange rates.
2.The cost changed, because of the increasing of labor and material cost
03.What logistics ways can we work for shipment?
1.Mostly we will go by sea, to all main continents such as South America, UAE, India etc by
container.
2.For neiberhood countries of China, such as Russia, we can ship product by train or road.
3.For light spare parts in urgent demand, we can ship them by international service such as
DHL,TNT, UPS or FEDEX.