Electric Scaffolding High Quality Zlp630 Lift Electric Suspended Platform Lifting Gondola Cradle
Electric scaffolding platform consists of suspension mechanism,hoist,safety lock,electric control box and platform.They have resonable structure and they are easy to operate.According to the actual needs,they are arbitrarily assembled and disassembled.Electric scaffolding platform applies to exterior wall construction,decoration,cleaning and maintance of high-rise buildings.
Working Principle of Temporary Suspended platform :
The platform is driven by electric hoist and wire rope, running against the building facade while the suspension mechanism was erected on buildings or structures.
Five main structure of Temporary Suspended platform:
(1) Platform
(2) Hoist Assembly
(3) Satety Device
(4) Electric System
(5) Suspension Mechanism
Parameter of Temporary Suspended Platform
ZLP630 | ZLP800 | ||
Rated load | 630kg | 800kg | |
Lifting speed | ~9.5m/min | ~8.5m/min | |
Platform size(L*W*H) | (3*2000mm)*700mm*1180mm | (3*2500mm)*700mm*1180mm | |
Suspension Mechanism | Rated exerted length of front beam | 1.1m~1.5m | |
Terrain clearance of front beam | 1.45m~1.75m | ||
Hoist | Type | LTD6.3 | LTD8 |
Power | 1.5Kw | 2.0Kw | |
Voltage | 220v/380V/415v | 220v/380V/415v | |
Speed | 1400n/min | 1400n/min | |
Braking torque | 15N.M | 15N.M | |
Safety lock | Type | LST30 | |
Angle of tilted locking rope | 3°~8° | ||
Allowable impact force | 30KN | ||
Wire rope | Type | 8.3MM | 8.3MM/8.6MM/9.1MM |
Cable line | Type | 3*2.5+2*1.5YC-5(one picec) | |
Counterweight | Type | Cement / iron cast |
PACKAGE & SHIPPING
Hoist and safety lock are packed in one plywood case, size 610*310*340mm;
Control box/ control panel is packed in a plywood case,size 570*440*270mm;
Other components are fastened by rope and then by pallet
20GP can load 8 sets with counter weight, 10~12 sets without counter weight
01.Which payment terms can we accept ?
Normally we can accept T/T, L /C, Western Union, sometimes D/P
1.T/T-----30% down payment is required in advance , 70% balance shall be settteled before
shipment or against the copy of original B/L .
2. L/ C----A 100% irrevocable L /C without "soft clause" can be accepted
02.How long will our price be valid ?
1.The rate of Usd dollars-----RMB varies significantly according to the intemational currency
exchange rates.
2.The cost changed, because of the increasing of labor and material cost
03.What logistics ways can we work for shipment?
1.Mostly we will go by sea, to all main continents such as South America, UAE, India etc by
container.
2.For neiberhood countries of China, such as Russia, we can ship product by train or road.
3.For light spare parts in urgent demand, we can ship them by international service such as
DHL,TNT, UPS or FEDEX.