Good quality ZLP Lift Scaffolding/ Suspended Platform/ Cradle/ Gondola/ Electric Scaffolding
1. Max lifting height: 100m;
2. Main models: ZLP500, ZLP630, ZLP800 & ZLP1000;
3. Types: Painted, hot galvanized, aluminum;
4. Voltage: 220v/380V/415V 50/60HZ 3 phass;
5. Couterweight: Cement, cement with steel cover, Iron-casting counterweight.;
6. H.S Code: 8428909090;
7. Certification: CE & ISO;
8. We can also customize for you.
Technical Parameters of Suspended Platform:
Specifications | |||
Type | ZLP630 | ZLP800 | ZLP1000 |
Rated Load | 630kg | 800kg | 1000kg |
Lifting speed | 9.3m/min | 8.5m/min | 8.3m/min |
Lifting height | 100m | 100m | 100m |
Hoist | LTD63 | LTD80 | LTD80sdrive |
Voltage-3Phase | 380V(415V/220V) | 380V(415V/220V) | 380V(415V/220V) |
Frequency | 50Hz/60Hz | 50Hz/60Hz | 50Hz/60Hz |
Power | 1.5kw*2 | 2kw*2 | 2.2kw*2 |
Safety Lock | LS30 | LS30 | LS30 |
Electric Control Panel Components | Schneider or CHNT | Schneider or CHNT | Schneider or CHNT |
Platform Sise (LxWxH) | (2+2+2)x0.69x1.18m | (2.5+2.5+2.5)x0.69x1.18m | (2.5+2.5+2.5)x0.69x1.18m |
Steel Wire Rope | 4pcsx100m 4x31SW+FC D=8.3mm | 4pcsx100m 4x31SW+FC D=8.3mm | 4pcsx100m 4x31SW+FC D=8.6mm |
Special Cable | (3x2.0+2x1.0mm2)100m | (3x2.0+2x1.0mm2 )100m | (3x2.0+2x1.0mm2)100m |
Counter Weight | 1000kg | 1000kg | 1000kg |
Qty of 20" Container | 10 sets | 10 sets | 10 sets |
Suspended platform provide safer, easier and more efficient work platforms for your workers. They are ideal for plaster, painting, repairing, decoration, cleaning, elevator installing, loading heavy row materials to higher grounds, etc. It is also widely used in the construction works of big-size tank, bridge, dam and chimney.
1. Platform(basket): Hot galvanized steel / Aluminum
01.Which payment terms can we accept ?
Normally we can accept T/T, L /C, Western Union, sometimes D/P
1.T/T-----30% down payment is required in advance , 70% balance shall be settteled before
shipment or against the copy of original B/L .
2. L/ C----A 100% irrevocable L /C without "soft clause" can be accepted
02.How long will our price be valid ?
1.The rate of Usd dollars-----RMB varies significantly according to the intemational currency
exchange rates.
2.The cost changed, because of the increasing of labor and material cost
03.What logistics ways can we work for shipment?
1.Mostly we will go by sea, to all main continents such as South America, UAE, India etc by
container.
2.For neiberhood countries of China, such as Russia, we can ship product by train or road.
3.For light spare parts in urgent demand, we can ship them by international service such as
DHL,TNT, UPS or FEDEX.