Constant Temperature & Humidity Testing Machine Double 85 Test
Use:
The Constant Temperature & Humidity Testing Machine Double 85 Test is used for testing the properties of materials in various environments and testing the heat resistance, cold resistance, dry resistance and moisture resistance of various materials.Suitable for testing quality of electronic, electrical, mobile phone, communication, instrument, vehicle, plastic products, metal, food, chemical, building materials, medical, aerospace and other products.
Parameters :
Machine Name | Constant Temperature & Humidity Testing Machine Double 85 Test | |||
Model | PT-2091A
| PT-2091B | PT-2091C | PT-2091D |
Inner Size | 400*500*500mm (W*H*D) | 500*600*500mm (W*H*D) | 500*750*600mm (W*H*D) | 600*850*800mm (W*H*D) |
Outer Size | 600*1400*1300mm (W*H*D) | 700*1500*1300mm (W*H*D) | 700*1650*1400mm (W*H*D) | 800*1750*1600mm (W*H*D) |
Test Volume | 100L | 150L | 225L | 408L |
Temperature | Low Temp:0℃,-20℃,-40℃,-55℃,-60℃,-70℃(optional) High Temp:+150℃,+100℃,+80℃ | |||
Humidity | 20%R.H~98%R.H (standard type) 5%R.H~98%R.H ( customized) 10%R.H~98%R.H ( customized) | |||
Temperature Fluctuation | ±0.5℃ | |||
Temperature Uniformity | ≤±2.0℃ | |||
Humidity Fluctuation | ±2.5%RH | |||
Humidity Uniformity | A)>75%RH:≤+2,-3%RH,B)<75%RH:≤±5%RH | |||
Heating Rate | About 3~4℃/min , no load | |||
Cooling Rate | About 0.7~1℃/min, no load |
Follow Standards:
GB-2423.1-89 (IEC68-2-1) test A: low temperature test method,
GB-2423.2-89 (IEC68-2-2) test B: high temperature test method,
GJB 360.8-87 (mil-std-202f) high temperature life test,
GBJ150.3(mil-std-810d) high temperature test method,
GJB150.4(mil-std-810d) low temperature test method.
JJF/1101-203 environmental test equipment temperature and humidity calibration specification.
Constant Temperature & Humidity Testing Machine Double 85 Test Picture:
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damage part for you for free.
DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.