RYG320240A Lcd Graphic Display Module 320x240 Dots 100% Replace HANTRONIX HDG320240
1. 320x240 dots
2. Parallel interface
3. Ultra high contrast, YG & White LED backlight as option
4. STN-blue, STN-Positive display results as option
Item | Description |
Product Name | 320X240 dots Graphic LCD Module |
Model No. | RYG320240A |
Dot Format | 320x 240 |
LCD Type | FSTN-Positive, STN-Blue |
Outline Dimension(mm) | 88.3x69.1 |
Viewing Area(mm) | 79.8 x 57.85 |
Pixel Size( mm) | 0.24 x 0.24 |
Viewing Angle | 6 O' clock |
Backlight | White or Y/G LED backlight |
Controller | NT7701&NT7709 |
Power supply | 3V |
Interface | Parallel |
Operating Temp | -20º C~70º C |
Storage Temp | -30º C~80º C |
Q1. How can I get the samples?
A: If you need samples, we can make as per your request .
You should pay the sample fee and freight. Sample lead time always be within 2-5 days.
Q2. How to order lcd?
A:Please send us your purchase order by Email, or ask us to send you one invoice. We need to know the following information for your order.
1)Product information-Quantity, part number
2)Delivery time required.
3)Shipping information-Company name, Street address,Phone&Fax number,Destination sea port.
4)Forwarder's contact details if you have any in China.
Q3. How long can I expect to get the sample?
A:The samples will be ready for delivery in 5~7days.The samples will be sent via express and arrive in 5~7 days.
Q4. When can I get the datasheet?
A: When we get your inquiry, you shall first tell us the part number you want, then we can send you the datasheet immediately
Custom Made Project Order Flow
1. Enquiry
Send us draft / details drawing, project schedule, application, qty. demand, etc by email ( to wendy@rylcd.com)
Quotation will be ready within 3 days ( normally 1 day).
2. Counter drawing
We will send out counter drawing after confirm of our quotation and received the tooling charge.
normally, 3 days for LCD glass and 1 week for LCD module.
3. Tooling samples
After drawing approval, tooling samples will be finished around 30 days
4. Mass production
After samples approval, mass production goods will be finished around 30 to 60 days. Depends of the order situation and materials supply siutuation.