A Technical specification
Control System | PLC Colored Touch Screen |
Main Frame | 18mm steel welding |
Main Power | 5.5kw |
Power Supply | 380V, 3-Phase,50Hz or any |
Forming Speed | 60m/min |
Roll Station | 10 stands |
Shaft Diameter | 42 mm |
Feeding Thickness | 0.3-0.8mm |
Cutter Standard | GCr12 |
Roller Standard | 45# Plating Cr |
c channel roll forming machine
2. Technical parameters:
Technical parameters: | |||||||
1 | Name of commodity & specification | c stud roll forming machine | |||||
2 | Main motor power | 3kw, 3 phase | |||||
3 | Hydraulic motor power | 3kw | |||||
4 | Hydraulic Pressure | 10-12MPa | |||||
5 | Voltage | 380V /3phase/ 50 HZ (or as your requirement) | |||||
6 | Control System | PLC Delta Inverter | |||||
7 | Main Frame | 300mm H-Beam | |||||
8 | Backboard Thickness | 14mm | |||||
9 | Chain Size | 20mm | |||||
10 | Feeding Material | color steel coils | |||||
11 | Feeding Thickness | 0.3-1.2mm | |||||
12 | Productivity | 8-12m/min | |||||
13 | Roll Station | 11 | |||||
14 | Roller Diameter | 70mm | |||||
15 | Roller material | 45# steel | |||||
16 | Cutter material | Cr12 , quenched | |||||
17 | Cr-Plating Size | 0.05mm | |||||
18 | Overall Size | 3000×800×1000mm | |||||
19 | Total Weight | 2T | |||||
20 | Components | Manual Uncoiler-------------------1 set Guiding Platform------------------1 set Coil Strip Leveler------------------1 set Main Machine of Roll Forming------1 set Electric-Motor---------------------1 set Cutting Device--------------------1 set Hydraulic Station------------------1 set PLC Control-----------------------1 set Supporter Table-------------------1 set | |||||
21 | Workflow | Manual decoiling----feeding and guiding----roll forming----cut to length----run out table | |||||
22 | Package | nude in the container | |||||
23 | Minimum order quantity | 1 set | |||||
24 | Payment terms | T/T(30% T/T pay in advance, the remaining 70% pay before ship) | |||||
25 | Delivery time | 30 working days later after receiving the deposit | |||||
All technical parameters can be changed, according to user's need. |