Specifications
Brand Name :
HC
Model Number :
sandwich
Certification :
CE
Place of Origin :
MADE IN CHINA
MOQ :
1Set
Payment Terms :
30% deposit by TT in advance, the balance to be paid before delivery.
Supply Ability :
20Set/Month
Delivery Time :
60days after receive agreed deposit.
Packaging Details :
Main machine is nude, the control panel is packed by carton box.
production speed :
0-5 m / min
Developed width :
1200 mm
Product thickness :
50-250 mm
color :
Blue
used :
new
material of the core :
foam
Description

High quality double metal sandwich panel roll forming machine production line

Glue Pump Discharge

This machine adopts K-9 Type Glue Metering Pump, low rpm, high precision. The glue quantity is adjustable between 0.1-0.2kg/min and average usage amount is 0.25-0.4kg/㎡.

Product Thickness

The thickness of sandwich panel is 50-250mm. The machine can process various of different thickness and scale by adjusting the distance between the upper layer and lower layer, the cutting tool holder up and down and the feeding device.

Double Metal Sandwich Panel Roll Forming Machine Line 0-5m/Min

Installation dimension 28000 * 2500 * 2500 mm
Total Power 25 kw
Voltage 380 V 50 HZ 3 phase

How to cleaning the glue pump

Remove the sprocket and the six screws on both sides, demount the gears and bearings from the inside, and put them and the three plates in a water solution of xylene or lacquer thinner and soak it for a while, then clean it.
Flatten the joints of the three boards with butter, install the gears and bearings in order, and tighten the screws.
Attention: The normal operation of the equipment also requires your careful maintenance!

Double Metal Sandwich Panel Roll Forming Machine Line 0-5m/Min

The material of the core foam or rock woll
Motor 25 KW
Production Speed 0 - 5 m/min
Annual output 6000000 m2

Maintenance after shutdown the glue


1.If you start up the machine every day, the pump station should be specially treated after shutdown and it will work normally the next day.


2.If the machine is shut down between 16-48 hours, all the small holes in the hose should be plugged with a pin and you can continue to work after pulling it out.


3.If the machine is shut down for 48 hours, the dripping hose should be removed and put away, the suction hose should be put back the glue barrel and insert into the glue liquid.


4.If the machine is shut down for a long period of time, you should start the glue pump once every three to five days, and cycle it for five to ten minutes to ensure that no air enters or you can remove where the glue is passes through, clean it and store it. This method is taught by professionals, please learn it and remember it.
Double Metal Sandwich Panel Roll Forming Machine Line 0-5m/Min

Send your message to this supplier
Send Now

Double Metal Sandwich Panel Roll Forming Machine Line 0-5m/Min

Ask Latest Price
Brand Name :
HC
Model Number :
sandwich
Certification :
CE
Place of Origin :
MADE IN CHINA
MOQ :
1Set
Payment Terms :
30% deposit by TT in advance, the balance to be paid before delivery.
Contact Supplier
Double Metal Sandwich Panel Roll Forming Machine Line 0-5m/Min
Double Metal Sandwich Panel Roll Forming Machine Line 0-5m/Min

Cangzhou Huachen Roll Forming Machinery Co., Ltd.

Verified Supplier
12 Years
hebei
Since 2013
Business Type :
Manufacturer, Exporter
Total Annual :
2000000-4000000
Employee Number :
50~100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement