Product Description
Rolling door forming machine is mainly used to make rolling door panels. It can process raw materials such as steel strips into rolling door panels with specific shapes (such as wavy, concave and convex shapes, etc.) through a series of roller pressing processes, and can control the dimensional accuracy and surface quality of the door panels, which is conducive to mass production of rolling door components with uniform specifications
Working Flow
Decoiling → Material Feeding → Roll Forming → Cutting → Collecting
Product Parameters
Material | Type | PPGI/GI |
Thickness | 0.8-1mm | |
Roller Station | 14Stations | |
Roller & Shaft Material | 45#steel Quenching and Plating | |
Diameter of Shaft | Φ50mm | |
Cutter Material | CR12 | |
Drive Type | Chain Drive | |
Maximum Forming Speed | 15m/min | |
Total Power | 4+4KW | |
Voltage | 380V 50Hz 3Phases |
Component & Technical Parameters
This part is used to support Coil.And make the coil in a rotary way.
Bearing capacity: 3TInner diameter: 470-530mm.(adjustable according to demand)
Shaft & Roller
Material is 45# Steel Quenching and Plating.The processed rollers are smooth, hard and will not rust.
Will not leave any scratches on the sheet when working.
Hydraulic Pump Station
The purpose of this pump station is to drive the cutter to start cutting works.
The hydraulic tank use 46# hydraulic oil.
Equipped with a cooling fan which can internal circulation cooling, to ensure the oil pump station will not be affected by high oil temperature during working.
Control Cabinet
The control cabinet has two modes, automatic and manual modes.
The unit length of the targeted sheet and quantity can be set in the touchscreen.
The system is simple and easy to operate.
Cutter
The material of blade is CR12.
With high strength, better hardenability and good wear resistance.
This part is used to collect the formed products.
The bracket is equipped with rollers to facilitate the product forwarding without being scratched.
Payment Terms
30% deposit by T/T before manufacture,
The balance to be paid before delivery.
Packing & Transportation
Main machine is nude, control system and motor will be packed with plastic film.
Machine needs 1X20GP container to transport.
Delivery Time
Within 45 days after receiving deposit.
Warranty
One year, and provide technical support services for whole life time.