Full Set Of Tyre Retreading Equipment Tread Building Machine
Tread builder
If not a larger cold feed extruder, it needs to paste adhesive (the cushion gum) before laminating tread. Now there are two traditional methods, one way is to install a pair of rubber roller on a rectangle table, and then press the adhesive onto the tread. Another way is to laminate the adhesive onto the casing surface directly. The former is better than the latter.
First method: after tread surface inspection, cover the adhesive, which has plastic film, on the tread by hand. Be noted that the hand is in close contact with the film cover, not the bonding surface, reducing the chance of contamination. Several finished products can be prepared for the next step for high efficiency, also note that the adhesive has the same length with tread rubber, no splice.
The second method: need an operation to laminate adhesive onto the tread inner surface, so occupy the work time. Of course the first method needs to add a machine. Apply the new tread onto casing surface consolidate in high gas.
Pressurized state, ensure it is straight, centered on the casing, and the end splices match. Now traditional practices still us manual operation, but advanced factories have adopted automatic tension control and laser positioning tread laminating machine, with high precision and efficiency.
Service after sales
1. One year quality guarantee and long-term technical support.
2. We can train your workers for free. If you need, we can install and assemble the machine in your workshop. And you should pay for the necessary costs, according to the international trade.