TR413C Chrome Sleeve Tire Valves Made With EPDM And Brass Stem Snap - In
SPECIFICATIONS
TR NO. | ETRTO NO. | RIM HOLE | EFF. LENGTH | APPLICATION |
TR412C | V2.03.6 | 11.5mm/ 0.453’’ | 22mm/ 0.88’’ | Passenger car |
TR413C | V2.03.1 | 11.5mm/ 0.453’’ | 32mm/ 1.25’’ | Passenger car |
TR414C | V2.03.2 | 11.5mm/ 0.453’’ | 38mm/ 1.5’’ | Passenger car |
TR418C | V2.03.4 | 11.5mm/ 0.453’’ | 51mm/ 2’’ | Passenger car |
TR415C | V2.03.3 | 15.9mm/ 0.625’’ | 32mm/ 1.25’’ | Passenger car |
TR423C | 11.5mm/ 0.453’’ | 64mm/ 2.5’’ | Passenger car |
Description
We supply many styles valves tire such as TR413C, TR414C ,AND TR415C ,TR418C series. Welcome to contact us for enquiries
1. Each and every single valve has to be approved by leaking test before shipped to our clients
2. Our products are made of only the highest quality materials.
3. Environmental protection.
4. Low cost, competitve price.
5. We can provide OEM
6. Professional service, quick response
7. Packing can be customized.
8. 100% leak test
9. Trial order acceptable.
Images
Why Choose US?
1.Our products are 100% leak tested and are made of only the highest quality materials
2.The tire valves can be quikly mounted to the rim.It is flexible in nature so it may provide complete air-seal even when it is bent for air service or tire pressure check.
3.It is Made with special rubber(as EPDM)compound to resist to O-zone damage and prevent temperaturedeterioration caused by rim hole ,heat,cold.Maximum inflation is420k Pa(60P.S.I)
4.we winned ISO/TS16949 ,ISO9001
5:delivery time: within one month normally
PACKAGING AND SHIPPING
Packaging:
100pcs/ bag; 10bags/ ctn
Blister packing as your request
Shipping:
By sea
By air
Courier shipment
FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods in inner packing and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.If you need neutral packing,pls contact us before ordering.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 15 to 20 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery