PRODUCT DESCRIPTION
The emergency steel bridge is based on the ZB200 bridge with ramps at both ends for easy access, so that vehicles and pedestrians can directly drive on the steel bridge. Depending on the field situation, the ramp can be one, two, three or four bays.
APPLICATION
Technical Specification
Span | 9.144m(30ft ) upto 60.96m(200ft) |
Road Width | single lane 3.15m/4.2m ; double lane 7.35m |
Material Grade | S460J0,S355JR,GR65,GR50 |
Load Capacity | HL-93,HS25-44, HA ,HA+20HB |
Surface Finish | Painted or Galvanized |
Joint System | Pin and Bolt System |
Erection Method | Crane lifting , Cantilever Launching Method |