Castle style small scale simple design galvanized steel pipe outdoor playgrond for primary school TQ-CB1280
Nowadays, as amusement equipment is becoming more and more common in people's lives, many people have begun to invest in some amusement equipment. When investing in amusement equipment, we often only pay attention to the preliminary preparations, but we ignore the late operation. Important, then, what issues should you pay attention to in the later stages of the operation of amusement equipment? Below, we will introduce you to the precautions that children's playgrounds must do in the later stages of operation.
First, the maintenance and cleaning of children's play equipment is not neglected. Safety is the first thing that children play, regardless of the situation, at all times. We remind you that your child's body is at a stage of development, resistance and immunity are weak, and dirty things can easily infect children, causing other diseases and discomfort.
Second, the layout and decoration of the children's playground venue should also be carried out later. Children's paradise is also a place for recreation and entertainment. Everything should be comfortable and pleasant. The interior decoration and layout of the park should be warm and festive.
Third, the addition of new children's play equipment. No matter how powerful and well-known the park and playground, the addition of new equipment is a must. Social technology is developing and progressing, and the new children's play equipment will certainly be upgraded and improved to a certain extent in terms of shape and function, and the charm is even better. We remind you that the introduction of new equipment in children's playgrounds and children's playgrounds is the best way to attract players' attention, and it also has a positive impact on the accumulation and long-term development of the park's customers.
Fourth, the recruitment and training of children's amusement equipment management personnel is a must. From the start of the children's play equipment to the end of the stoppage of the equipment, training should be strengthened for some common problems and attention to detail of the equipment. This is good for the benefits of the park, and it is good for the safety of the child, just in case.
The above four points can explain the work that needs to be done after the operation of the amusement equipment site. Therefore, we remind the operators again that after the playground has been in operation for a period of time, it is necessary to take some time to study it. How to take one step in order to achieve long-term profitability.
Measurements (mm) | 710*700*510CM (L*W*H) |
Safety Area (mm) | 1010*1000(L*W) |
Certificate | ISO9001, SGS,CE |
Modules | Roofs, slides, plastic panels, stairs, decks, tubes and posts, climbing. |
Material | A. Plastic parts: Imported LLDPE |
B. Post: National standard galvanized steel pipe | |
C. Metals: Galvanized | |
D. Deck, stair, bridge: Steel with plastic covered | |
E. Fasteners: 304 stainless | |
(Different material is available at your demand. ) | |
Advantage | a.Anti-UV |
b.Anti-static | |
c.Security | |
d.Environmental protection | |
e.Color is not easy to fade | |
Installation | 2 day (2 persons) |
Falling Height (mm) | 2200 |
Age Range | 3--12 age |
Capacity | 10-20 persons |
Apply to | Amusement park, kindergarten, preschool, residential area. |
Packing | Standard export packing |
Plastic parts: Bubble bag and pp film; | |
Iron parts: Cotton and pp film | |
Delivery Volume:16CBM | |
Use Life | 7-10 years |
Remark | 1.Please check the screws and other catchers regularly to assure the firm structure. |
2.Please make sure that all the kids play with adult supervision. | |
3.Blunt objects and acid corrosive liquor are forbidden. |