Most Powerful Multi Cylinder Diesel Engine Cummins MTAA11- G2 For Diesel Generator Set
Description of Cummins Engine-MTAA11-G2:
Technical parameters of diesel generator sets: | ||||||||
Generator Set | ||||||||
Generator Model | XS-250C | |||||||
Prime Power | 250kw | |||||||
Rated Voltage | 400/230V | |||||||
Frequency | 50Hz | |||||||
Power Factor | 0.8(lagging) | |||||||
Dimension (L×W×H) (mm) | 3100*1100*1650 mm | |||||||
Genset weight (kg) | 2700 kg | |||||||
Diesel Engine | ||||||||
Brand | Cummins | |||||||
Type | MTAA11-G2 | |||||||
Number of Cylinders | 6 | |||||||
Rotating Speed | 1500RPM | |||||||
Cycle | Four stroke | |||||||
Cooling Method | Water Cooling | |||||||
Bore×Stroke(mm) | 125*147 | |||||||
Displacement(L) | 10.8 | |||||||
Compression Ratio | 15:1 | |||||||
Speed Governor | Electrical | |||||||
Cooling System | Water-cooled | |||||||
Total Lubrication System Capacity (L) | / | |||||||
Fuel Consumption at 100% Load | 67.5 L/H | |||||||
Starting Method | 24V Electrical starting | |||||||
Alternator | ||||||||
Brand | Xiangyang Xinsheng | |||||||
Model | HJI250 | |||||||
Prime/Standby Power | 250kw | |||||||
Connecting Type | 3 Phase and 4 Wires | |||||||
Number of Bearing | single | |||||||
Protection Grade | IP23 | |||||||
Altitude | ≤1000M | |||||||
Exciter Type | Brushless ,Self-exciting, AVR automatic voltage regulating | |||||||
Insulation Class | H |
A: Test before shippment
- Each Generator Set shall be put into commission more than 4 hours totally, tested on idle load, fully load and 10% overload.
- Noise level shall be tested.
- All of the meters on the control panel shall be tested.
- The appearance of the Set and the label, nameplate shall be tested. "
-Voltage available: 50Hz: 380-400-415V/ 220-230-240V; 60Hz: 220-380-416-440-480V/ 110-208-220-
240V. Any special voltage is also available as cilent's request.
B: Packing & Warranty
- Packing: Wooden Case, Plywood or Metal Case.
- Delivery Time: Less than 25 working days after receiving prepayment.
- Warranty: One year or 1, 000 hours from the date of shippment
(15 Months or 1, 200 hours for Alternator Part).